Product guide

Diesel Generator Sets

A diesel generator set is an engine, an alternator and a control panel mounted on a common base frame and rated to a defined duty. This guide covers how the ratings on a datasheet are defined, which power range fits which job, and what has to be in an enquiry before a set can be selected.

Request a quote Chat on WhatsApp

Ratings

How a generator set is rated

Two sets with identical hardware carry different numbers depending on the duty they are sold for. ISO 8528-1 defines the four ratings that appear on commercial datasheets.

RatingDutyOverloadAnnual hours
ESP — emergency standbyMains failure onlyNot permittedUp to about 500 h
PRP — prime powerContinuous variable load10% for 1 h in every 12 hUnlimited
COP — continuous powerConstant load, no variationNot permittedUnlimited
DCP — data centre powerVariable load, defined step limitsPer manufacturer declarationUnlimited

ESP is always quoted higher than PRP for the same machine. If a tender asks for one figure without naming the rating, ask which one it is — the difference is typically 10% of the rating.

Power ranges

Which power range fits which job

Typical duty by rating. Final sizing always depends on your load list.
RatingTypical dutyUsually configured as
20–100 kVARetail units, telecom cabinets, small offices, villasSingle-phase or three-phase, open frame or small canopy
100–300 kVAOffices, hotels, clinics, small factoriesThree-phase canopy, optional automatic transfer switch
300–800 kVAHospitals, production lines, data hallsThree-phase canopy or containerised, parallel-ready control
800–2000 kVAData centres, large plants, marine and rental fleetsContainerised or open skid, multi-set parallel configuration

Pages by power range

Each page carries the rating, the typical specification envelope for the class, the applications it suits and the questions we are asked most often at that size.

Form factors

Four ways to package the same set

  • Silent canopy diesel generator set

    Silent canopy

  • Containerised

    Set, tank and controls inside a 20 ft or 40 ft container with service access doors. Chosen when weather protection, security and long autonomy all matter.

  • Trailer-mounted diesel generator set

    Trailer-mounted

  • Open frame diesel generator set

    Open frame

Electrical system

Voltage and frequency combinations

VoltageFrequencyCommon in
400/230 V50 HzMiddle East, Africa, Europe, South Asia
380/220 V50 HzOlder installations and projects written to legacy specifications
415/240 V50 HzSpecifications written to legacy UK standards
440/254 V60 HzWest and Central Africa, legacy Gulf networks
480/277 V60 HzNorth American specifications and data centre tenders

Frequency is set by engine speed — 1500 rpm for 50 Hz and 1800 rpm for 60 Hz — so the frequency must be fixed before the set is built, not adjusted afterwards. Which countries use which frequency, and what a mismatch does to motors and pumps, is set out in 50 Hz vs 60 Hz.

Voltage is fixed in the same way and at the same moment, and it is a separate decision from frequency. Why 380 V, 400 V and 415 V are one 50 Hz machine wound and trimmed differently, and when a single phase set is the right answer, is set out in generator voltage and phases.

Once the voltage is fixed it fixes the current, and the current fixes the conductor. The full load current per phase, the temperature and grouping corrections that cut the capacity you paid for, the voltage drop over the route and the breaker setting that co-ordinates with the alternator are worked through in generator cable sizing and voltage drop.

The current has a second consequence, at the instant a motor starts. The locked rotor current a motor asks for, the starting kVA that becomes, and what direct on line, star-delta, soft start and a variable frequency drive each do to the voltage dip are worked through in generator starting current and motor starting.

Those currents and that voltage are watched, and acted on, by the control panel. What the controller measures, why every protection carries a delay, and how the settings have to co-ordinate with the ATS and with the site, are worked through in generator control panel and protections.

Construction

What is inside the set

ComponentWhat to check on the datasheet
Diesel engineMake and model, governor type (mechanical or electronic), rated speed, fuel consumption at 50/75/100% load
AlternatorMake and model, insulation class, temperature rise, voltage regulation, IEC 60034 rating
Control panelAuto mains failure (AMF) capability, protections, remote monitoring options
Base frame and tankAnti-vibration mounts, base tank capacity, autonomy at full load
Cooling and exhaustRadiator sized for site ambient, silencer type and noise level at 7 m
OptionsAutomatic transfer switch, parallel control, bundled tank, canopy or container, remote monitoring

Engine makes commonly specified in these power classes include Cummins, Perkins, Volvo Penta, Weichai, Yuchai, Deutz, Kubota, Yanmar and Lovol, paired with brushless alternators such as Stamford, Leroy-Somer or Marathon. How the two most common of those makes compare is set out in Cummins vs Perkins.

The papers that travel with a set are a separate subject from the machine, and they are asked for later than they should be. What CE marking, Stage V and the United States rules actually cover, and what to check in a document pack, is set out in generator export certification.

Most of what a set does after it is installed is not a failure but a symptom, and finding the cause is a matter of order. The checks that come first, the alarms worth taking seriously and the readings that make a diagnosis possible are set out in diesel generator troubleshooting.

Whether to rent a set or to buy one is a decision about hours and duration rather than about the machine, and the cost lines that decide it are rarely the ones printed on the quotation. The comparison, and the questions to ask of a rental contract, is set out in rental or buying a diesel generator.

Heat, humidity, dust and altitude change the specification before the machine is ordered, and those changes are far easier to make on paper than on site. What each condition does to the set, and how the de-rates combine, is set out in diesel generators for hot and humid climates.

Noise is the item most often argued about after delivery, because the number printed on the data sheet is rarely the number the site will measure. What the standards actually regulate, what each enclosure class delivers and where a site limit really comes from is set out in generator noise standards and attenuation.

The used market is where the price is lowest and the evidence is thinnest, and the difference between a good buy and an expensive one is the order in which the checks are made. What to inspect, what should be in the document pack, and when a used set stops being a saving is set out in used diesel generator inspection.

What a set costs to own is decided by four lines, and only one of them is on the quotation. How fuel, maintenance, capital and downtime behave at different duties, and how to build a total cost per delivered kWh, is set out in diesel generator total cost of ownership.

Selection

Five steps from load list to order

  • 1. List the loads

    Running kW and power factor for each load, plus the starting method of the largest motor.

  • 2. Fix the duty rating

    ESP, PRP, COP or DCP. This single choice changes every number that follows.

  • 3. Fix voltage and frequency

    Build the electrical system first — it cannot be changed on site later. The earthing and neutral arrangement is part of this step, because it fixes the changeover poles and the protection, and it is set out in generator earthing and the neutral.

  • 4. Confirm site conditions

    Ambient temperature, altitude, noise limit, fuel storage and access route. Fuel storage is not only a volume: the tank arrangement, and the usable fuel behind the nominal figure, decide the autonomy, and both are set out in generator fuel tank, autonomy and fuel management. The room that will hold an open set belongs to the same step: the airflow, the heat left inside and the service clearances are set out in generator room design. Where the set will stand outdoors, the enclosure rating and the corrosion class follow from the same answer: generator enclosure IP rating, corrosion and coastal sites sets out what the two digits actually test, the corrosivity categories and the finishes that survive a coastal site. What the set will stand on is the other half of that answer, and it is a decision about the building rather than about the machine: generator vibration, anti-vibration mounts and foundations sets out the three paths the vibration takes, why the floor decides between rubber pads and spring mounts, and how heavy a plinth or inertia block has to be.

  • 5. Choose form and controls

    Canopy, container, trailer or open frame; single set or paralleled; ATS or manual.

Two commercial choices follow the five: the delivery term, EXW, FOB or CIF, and the date the set is wanted. Both go into the quotation. Generator lead time, packing and shipping terms sets out what makes up the lead time, what each term covers, and how a set is packed and loaded for sea freight.

Before it leaves the works, and again once it is installed, the set is proved on load, and what each of those two tests covers is set out in factory test and site acceptance.

Once the set is on site, the maintenance schedule decides whether it is still carrying the load in ten years, and generator spare parts and consumables decides whether the next service can be done on the day it falls due.

Questions

Common questions

What is the difference between kVA and kW?

kVA is apparent power and kW is real power; the ratio between them is the power factor of the load. Generator sets are rated at a 0.8 power factor as a convention, so a 500 kVA set is quoted as 400 kW. A load with a lower power factor uses more kVA for the same kW.

How much fuel does a diesel generator use?

Budget roughly 0.24 to 0.27 litres per kWh delivered. A 400 kW set running at 75% load, so about 300 kW, therefore burns in the region of 72 to 81 litres per hour. Part-load running is less efficient per kWh than running near rated load.

Should I choose 1500 rpm or 3000 rpm?

Most 50 Hz sets are 1500 rpm four-pole machines, and most 60 Hz sets are 1800 rpm; those speeds are the standard for continuous duty. Higher-speed sets are smaller and lighter but are generally used for light or portable duty.

What does an automatic transfer switch do?

It watches the mains supply, starts the generator when the mains fails, and transfers the load once the set is at voltage and frequency. Transfer typically happens within 8 to 15 seconds of a mains failure, and it transfers back when the mains returns.

It watches the mains supply, starts the generator when the mains fails, and transfers the load once the set is at voltage and frequency. Transfer typically happens within 8 to 15 seconds of a mains failure, and it transfers back when the mains returns. The switch itself and the AMF controller are two different parts of the package, as explained in ATS vs AMF.

What is derating and when does it apply?

Engine and alternator output both fall when ambient temperature is above 40 °C or the site is above 1000 m altitude. The exact derating curve is declared by the engine and alternator manufacturers, so the site conditions have to be known before the rating is finalised.

How much noise does a silent set make?

A canopy set is normally quoted between 65 and 75 dB(A) at 7 m, depending on the enclosure and the rating. If a tender sets a limit below 65 dB(A), the enclosure has to be specified for it rather than chosen from a catalogue.

Not sure which rating you need?

Send the load list, the site conditions and the frequency. We will reply with the rating and the build options that fit.

Request a quote