A generator set crossing a border is asked for documents by three different people, and they are almost never asking for the same thing. The customs broker wants the set to be allowed into the country. The electrical inspector wants the installation to be safe. The engine maker’s paperwork answers a third question again – what comes out of the exhaust. Most arguments about a certificate pack are really one of those three being handed over as if it answered another.
Three questions, three different documents
The word “certification” hides the whole problem. A diesel generating set is a machine, an electrical installation, an emissions source and a noise source at once, and each of those is regulated by different instruments, attested by different people and checked at different points. Sorting an enquiry means asking which of the three questions below the buyer actually has to answer before the set lands.
| Question | What answers it | Who issues or signs it | Who checks it |
|---|---|---|---|
| May the engine be placed on the market and run in this country? | Engine emissions approval: an EU type-approval to Stage V, or an EPA certificate of conformity, or a CARB Executive Order | The engine manufacturer | Customs and market surveillance |
| Is this set a lawful, safe product to sell here? | Product conformity documents, headed in the EU by the declaration of conformity and the CE mark | Whoever places the set on the market – normally the packager or the exporter | Market surveillance, and the buyer’s own inspector |
| Is the machine any good? | ISO 8528 and IEC 60034 data, the datasheet, the factory test report | The set builder, the alternator maker and the engine maker | The buyer’s engineer |
A quotation that says “CE certified” has answered none of them until the document is produced, and the document that matters is usually not called a certificate at all. The rest of this page is about telling those papers apart, and about the two things that are asked for most often and answered least well: the EU declaration of conformity, and the engine emissions approval.
If the paperwork question is settled and the machine itself is the next step, the range and the builds are described on the diesel generator overview.
What CE marking actually is
CE marking is not a certificate issued by the European Union, and there is no EU body that grants it. It is the manufacturer’s own attestation that the product meets the EU legislation that applies to it, backed by a technical file and signed off in an EU declaration of conformity. For most machinery the route is self-declaration: the builder assesses the product against the applicable requirements, compiles the technical documentation, draws up the declaration, and affixes the mark. A notified body is involved only where the legislation for that product requires it.
Two details follow from that, and both matter to a buyer. First, the legal document is the declaration of conformity, not a certificate; a well-produced “CE certificate” from a consultancy can sit alongside a file that does not actually demonstrate anything. Second, the responsibility sits with the entity that places the set on the market. When a set is built in one country and shipped to another, that is not always the factory that made the engine – which is why the name on the declaration is a question worth asking.
For machinery, the applicable instrument is Directive 2006/42/EC. It is replaced by Regulation (EU) 2023/1230, which applies from 20 January 2027; some of its rules, including those for notified bodies, took effect earlier. A set placed on the EU market today is assessed against the directive, and a set placed on the market after that date against the regulation. If a supplier’s documents do not give a date, the file cannot be tied to either.
The regimes a generator set normally falls under in the EU
The CE mark on a generating set is normally the sum of four regimes, plus the engine’s emissions approval, which is a separate approval held by the engine manufacturer rather than by the set builder. The table maps them; it is a map and not legal advice, and the importer of record should confirm the current text for the destination country.
| Regime | Instrument | What it covers on a set |
|---|---|---|
| Machinery | Directive 2006/42/EC, replaced by Regulation (EU) 2023/1230 from 20 January 2027 | The set as a machine: guarding of rotating parts, stability and lifting points, controls and emergency stop, markings and instructions |
| Electromagnetic compatibility | Directive 2014/30/EU | The control panel, the automatic voltage regulator and the set’s electrical emissions and immunity, so that it does not disturb other equipment on site |
| Low voltage | Directive 2014/35/EU | Electrical equipment operating within the directive’s voltage range – the case for the alternator, control gear and protection of a low-voltage set |
| Outdoor noise | Directive 2000/14/EC | Noise emission of equipment used outdoors. Generating sets below 400 kW are one of the listed categories, which brings them within the sound power limits and the declaration of the guaranteed sound power level |
| Engine emissions | Regulation (EU) 2016/1628 (Stage V) | The engine, not the set: the emissions approval is held by the engine manufacturer and travels with the engine family |
Read as a package, the table explains a common gap. A packager can put together a set from a certified engine, a certified alternator and a certified controller and still not have the set-level documents in order, because the machinery and noise assessments are made at the level of the finished set and the finished set is what was assembled.
What the EU declaration of conformity has to say
The declaration is a short document, and its value is in the details. These are the lines that make it worth reading rather than filing; if one is missing, the document is weaker than it looks.
- The full legal name and address of the manufacturer, and of the authorised representative where one is appointed.
- An identification of the machinery that is specific enough to tie the paper to the machine – type, model and serial number, not a family name.
- A statement that the machinery complies with the applicable legislation, with the instruments listed by their numbers rather than by a general phrase.
- The references to the standards or technical specifications used, including the year of each standard.
- Where a notified body was involved, its name and identification number and the reference of the certificate it issued.
- The place and date of issue, and the name and function of the person who signs for the manufacturer.
- The language required by the destination market, since a declaration that only exists in a language the inspector cannot read is not much use at the port.
The single most useful check takes a minute: put the declaration next to the machine’s rating plate and compare the serial number, the engine model and the alternator model. A declaration that names a model the set does not carry, or a serial that does not exist on the plate, is a template rather than a record.
Engine emissions: what Stage V means for a generator
Emissions approval is different in kind from the CE question. It is held by the engine manufacturer, it is tied to the engine family and the power band, and it is the document a customs officer is most likely to ask for when a set is imported into the EU. Regulation (EU) 2016/1628 sets the Stage V limits for non-road engines; the stages were phased in from 2018 with full enforcement from 2021, and the engine that is fitted to a set built today should normally carry a Stage V approval.
The regulation does contain exemptions and transitional provisions for particular applications and engine categories, and suppliers sometimes describe a set as “exempt” without saying which provision is being used. That is not a reason to distrust the claim, but it is a reason to ask for it in writing, with the article or annex referenced. An exemption that cannot be identified in the regulation is not an exemption.
What to ask the engine maker or the packager for, in one line: the EU type-approval number or the exemption reference, the engine family and model it belongs to, and the rated power band it covers. If the set is going to more than one market, ask for the US and California documents at the same time, because the engine is usually the same and the paperwork is not. Which engine is fitted is a separate decision, and how the two makes most often specified compare is set out in Cummins versus Perkins.
Engine emissions: the United States
A set that is installed in the United States is regulated through the engine, and the rule that applies to a stationary engine is not the same as the rule for a vehicle or for mobile non-road equipment. Stationary compression-ignition engines are covered by 40 CFR part 60, subpart IIII, which separates engines into two categories with different standards and very different operating limits: emergency engines and everything else.
For a non-emergency stationary engine, the manufacturer certifies the engine to the non-road compression-ignition standards of 40 CFR part 1039 – the Tier 2 and Tier 3 levels, chosen by rated power and model year – together with the applicable smoke standards. For engines of 37 kW (50 hp) and above that certification applies from model year 2007. For an emergency engine there is a separate standard for manufacturers, and a separate set of obligations for the owner, which is where the practical difference shows up.
| Emergency engine | Non-emergency engine | |
|---|---|---|
| Standards the manufacturer certifies to | The emergency-engine standards of 40 CFR 60 subpart IIII | The non-emergency standards of the subpart, referencing the non-road tiers of 40 CFR part 1039 |
| How long it may run | Emergency operation is capped at 100 hours per calendar year, and maintenance checks and readiness testing count towards that total | No emergency cap; the engine is installed for the duty it was certified for |
| What that means on site | The label describes a limited-use machine, and the hours have to be logged | The set can carry the load as a matter of routine |
That 100-hour ceiling is the fact most often missed in a quotation discussion. In the United States, an emergency-rated set cannot be used as a prime power machine simply because it starts and runs; using it beyond the permitted hours is a compliance matter for the owner, separate from what the set can physically do. A buyer who needs continuous running should be buying a set certified for that duty, not asking an emergency set to behave as one.
California adds its own layer on top of the federal rule. An engine sold into California normally needs an Executive Order from the California Air Resources Board in addition to the federal certificate, and the two documents name the engine family. When a destination is anywhere in the United States, asking for both the EPA certificate and, where relevant, the CARB Executive Order costs nothing and avoids a problem that is only discovered at the port.
Noise: the guaranteed sound power level is not the dB(A) at 7 m
Two numbers about noise appear in generator paperwork, and treating them as one is the most common documentation error a buyer will meet. The figure the outdoor noise directive regulates is the guaranteed sound power level, LWA, measured and declared under a prescribed method. It describes the total acoustic power the machine radiates, and it is what appears in the declaration of conformity. The figure used for site planning is a sound pressure level at a stated distance – the familiar dB(A) at 7 m – and it depends on where the set is standing, how it is installed and what is around it.
A set below 400 kW is a listed category under Directive 2000/14/EC, and it is worth knowing why the 400 kW line exists: the directive’s list puts power generators up to that rating in the category that is subject to sound power limits and to the declaration of the guaranteed level. A supplier who answers a compliance question with a 7 m figure has answered a different question, and the certificate pack should show which of the two is being declared.
For the site itself, the 7 m figure is still the useful one, because it is what a boundary noise assessment is built from – the level drops with distance, and the enclosure, the orientation of the radiator and the reflecting surfaces all move the number. The point is only that the two numbers live in different documents: one is declared to a regulator, the other is used to design the installation.
The standards behind the datasheet
The third question – whether the machine is any good – is answered by standards rather than by approvals, and they are the ones a specification should name. These are the same lines that appear on the certifications and factory testing page, and they belong in a purchase specification for the same reason: they make a quotation comparable.
| Standard | What it fixes | Where you see it |
|---|---|---|
| ISO 8528-1 | The definitions of the ESP, PRP, COP and DCP ratings | The rating line on the datasheet and in the quotation |
| ISO 8528-5 | Load acceptance and transient behaviour of generating sets | The largest load step the set will take at a given rating |
| IEC 60034 | Rotating electrical machines: insulation class, temperature rise, voltage regulation | The alternator data on the datasheet |
| ISO 3046 | Reciprocating engines: power definitions and fuel consumption | The engine figures and the litres per hour |
| IEC 60204-1 | Electrical equipment of machines: protection, earthing, emergency stop | The control panel and the wiring diagram |
What those standards are not is a certificate. A type test report quoting IEC 60034 tells you how the alternator was classified; it does not tell you that the set as installed will hold voltage on your load step. That is what the datasheet’s rating line and a load test are for – and if the duty rating on the set is wrong for the application, no standards list repairs it, which is the subject of prime versus standby power.
What should arrive with the machine
A set that has been bought well arrives with two document packs, and a buyer who treats them as one will be missing something at the port. The engineering pack is used on site; the customs and conformity pack is used at the border and by the inspector. Both should be listed in the purchase order, because chasing either one after the container has sailed is the expensive way to find out it was never made.
| Engineering pack | Customs and conformity pack |
|---|---|
| Datasheet with the rating and the engine and alternator data | Declaration of conformity, naming the set by model and serial number |
| Factory test report with the readings and the test date | Engine emissions approval – the Stage V type-approval or the EPA certificate, and the CARB order where the destination needs one |
| Wiring diagram as built, and the operation and maintenance manual | Certificate of origin, commercial invoice and packing list for the shipment |
| Spare parts list, consumables and the warranty statement | Any destination-specific conformity marking or registration the importer of record has asked for |
| The load test record where a load bank test was specified | Guaranteed sound power level, where the market requires it |
The pack that is most often incomplete is the second, and the reason is structural rather than dishonest: the factory that built the set, the company that sells it and the company that imports it can be three different names, and each of them assumes one of the others is holding the conformity file. Asking for the list in the purchase order, with the serial number on the declaration, closes that gap before it becomes a port problem. Two further lines decide whether the machine fits the site rather than the border, and neither belongs in the conformity file: the voltage and frequency it is built for, which is the choice between 50 Hz and 60 Hz, and the kVA and kW figures on the plate, which are read against the rating as set out in kVA and kW.
The documents are only half of the shipment. What travels with the set, how it is packed and drained, and which delivery term applies are set out in generator lead time, packing and shipping terms.
Red flags in a certificate pack
None of these is proof of a bad machine, and all of them are reasons to ask one more question before transferring money.
| What you see | What it usually means | What to ask for |
|---|---|---|
| A “CE certificate” issued by a consultancy, and no declaration of conformity | For most machinery the legal document is the declaration; a certificate is not a substitute | The EU declaration of conformity, signed, with the serial number of the set |
| A declaration that names a different model or serial number | A template filled in for a similar build | A corrected declaration for the machine being shipped |
| An ISO 9001 certificate presented as product certification | A quality management system is not product conformity | The applicable product standards and the test report |
| A dB(A) figure at 7 m offered as evidence of compliance | The regulated figure is the guaranteed sound power level, not a level at a distance | The declared LWA and the measurement standard used |
| An engine emissions certificate with no engine serial or family | The document cannot be tied to the machine in front of you | A certificate naming the engine family, model and serial |
| “CE” shown on the engine only | The engine’s approval does not make the finished set a conforming machine | The set-level conformity documents, from whoever places the set on the market |
| Documents promised after payment, as PDFs | Nothing is wrong yet, but nothing can be checked yet either | The document list written into the purchase order, with the file sent before shipment |
Questions
Does a diesel generator need CE marking to be sold in the EU?
If the set is placed on the EU market, it has to conform to the legislation that applies to it, and the CE mark with a declaration of conformity is how that is attested. The engine’s emissions approval is a separate requirement that sits with the engine manufacturer. A set built for a market outside the EU does not need CE marking for that destination, although buyers in other regions often ask for the European documents as a quality signal – which is a different thing from a legal requirement.
Is a CE certificate the same as a declaration of conformity?
No. The declaration of conformity is the legal document, signed by or for the manufacturer, that names the product, lists the legislation and standards applied and carries a signature. “CE certificate” is a market phrase for the pack that accompanies it. For most machinery there is no third-party certificate at all, so a quotation that offers one and cannot produce a declaration has offered the wrong document.
Do I need EPA certification if the set is going to Africa or the Middle East?
Not for the destination, because EPA and Stage V approvals are tied to the markets that require them. What matters is what the destination country and the importer of record ask for, and that varies: some ports check an engine emissions document, some ask for a conformity document from the supplier, and some ask for neither on a set that is not registered for road use. The cheap answer is to ask the importer of record for the required document list before the order is placed, and to have the engine documents ready either way.
Can a used generator set be imported into the EU?
A used set placed on the EU market is still a machine being placed on the market, and the obligations attach to whoever puts it there rather than to the factory that built it. The engine’s emissions position is judged separately, against the approval the engine carries. Because the answer depends on the age and history of the specific unit, this is a question for the importer and, where the value justifies it, for a customs adviser – not something to settle from a generic page.
Who signs the declaration of conformity – the engine maker, the factory or the seller?
Whoever places the finished set on the market signs for the set. In an export deal that can be the packager or the seller acting through an authorised representative, which is exactly why the name and address on the declaration is worth reading. The engine maker signs its own emissions documents, and those do not cover the set around the engine.
What is the difference between Stage V and Tier 4?
They are two different regulatory frameworks for the same kind of engine: Stage V under EU Regulation 2016/1628, and the US tiers under the non-road standards of 40 CFR part 1039, with California applying its own requirements on top. The limits and the certification procedures are not interchangeable, so an engine approved for one market is not automatically approved for the other. Ask for the approval that matches the destination, and if the set is going to both, ask for both.
Send the destination, not just the rating
Tell us where the set is going, what the importer of record has asked for and the duty it will run, and we will quote the set with the document pack for that market – and say plainly which documents come from the engine maker rather than from us.
Written and maintained by the KVA Grid sales engineering desk. The regulatory references on this page are: Directive 2006/42/EC and Regulation (EU) 2023/1230 (machinery, the regulation applying from 20 January 2027), Directive 2014/30/EU (electromagnetic compatibility), Directive 2014/35/EU (low voltage), Directive 2000/14/EC (outdoor noise, generating sets below 400 kW being in its listed categories) and Regulation (EU) 2016/1628 (Stage V). The United States references are 40 CFR part 60, subpart IIII for stationary compression-ignition engines, including the 100-hour annual limit for emergency operation, with certification to the non-road standards of 40 CFR part 1039. This page is an explanation for buyers and not legal advice; the importer of record should confirm the current requirements for the destination, and KVA Grid does not claim to hold certificates on behalf of any manufacturer. Reviewed 2 October 2026.