A diesel generator is bought on one price and paid for against four. Fuel, maintenance, capital and downtime behave differently at different duties, and the mistake that costs most is judging a set by its quotation alone. This page sets out what each line contains, how the figures move with load and with duty, and how to build a total for a specific site.
What total cost of ownership actually contains
Total cost of ownership is the sum of every line the set creates over its working life, divided by the energy it delivers. Four lines do almost all of the work, and they behave in opposite directions depending on how the set is used.
The first is capital: the set, the enclosure, the switchgear, the installation and the commissioning. The second is fuel, which is trivial on a standby set that runs fifty hours a year and dominant on a prime power set that runs several thousand. The third is maintenance and consumables – oil, filters, coolant, belts, hoses, batteries and the labour to change them. The fourth is downtime: the cost of the load not being carried, which never appears in a quotation and is usually the reason the machine was bought.
Only the first line is visible at the point of purchase, and it is the smallest of the four over a long prime power life. That is the whole argument for doing the arithmetic before ordering rather than after.
Fuel: the line that decides the answer
Fuel is the only line that is consumed in proportion to the work done, which makes it the largest on any set that runs for a living and almost irrelevant on one that runs for outages. The figure that matters is not litres per hour but litres per delivered kWh, because that is the number a part-loaded set punishes you with.
The arithmetic behind it, and the tables by set size, are set out in fuel consumption. The single table worth carrying in your head is the one below, because it shows the trap: a set running at a quarter load burns a third of the fuel per hour and half as much again per kWh.
| Load | Electrical output | Fuel | L per kWh | Against full load |
|---|---|---|---|---|
| 100 % | 400 kW | 101 L/h | 0.253 | Baseline |
| 75 % | 300 kW | 80 L/h | 0.268 | +6 % per kWh |
| 50 % | 200 kW | 60 L/h | 0.298 | +18 % per kWh |
| 25 % | 100 kW | 37 L/h | 0.366 | +45 % per kWh |
Two consequences follow, and they pull in opposite directions. Sizing a set close to its load improves the fuel figure and removes the margin that site conditions take away. Oversizing to be safe lowers the fuel efficiency of every kWh the set ever delivers, and it is the more expensive of the two mistakes because it is paid for continuously. How much output the site itself takes away, through heat, altitude and dust, is set out in hot and humid climates.
Maintenance: what the schedule costs over a year
Maintenance is the line most often quoted as a rule of thumb and least often built from the actual schedule. It is driven by two clocks, and whichever arrives first triggers the work, which is why a standby set with few hours still costs money every year. The intervals and the reasoning are set out in the maintenance schedule.
| Item | Times per year | Driven by |
|---|---|---|
| Walk-round inspection | About 52 | Calendar, and cheap compared with what it prevents |
| Engine oil and oil filter | About 4 | 500 hours, or 12 months, whichever comes first |
| Fuel filters and water separator | About 2 | 1,000 hours, and fuel quality |
| Valve clearance check | About 2 | 1,000 hours, or 12 months at low usage |
| Coolant test | About 2 | 1,000 hours, and chemistry that drifts with age |
| Major service | 1 | The 2,000 to 4,000 hour band: fuel system, injectors, cooling |
| Load bank test | 1 | Annual, and the only item that proves the rest worked |
The volume of work tracks the hours, but the cost per year does not fall to zero when the hours do, because the calendar items still arrive. A set that runs 40 hours a year still needs its oil, its filters and its coolant checked, and it needs them more urgently than a set that runs every week. Wear items are cheap in themselves and expensive in their consequences, which is why the maintenance line is the wrong place to make savings.
Capital, and why the cheapest quote is not the cheapest set
Capital is the line that is compared and the line that is most often compared wrongly. Two quotations for the same kVA can differ by a wide margin without either being dishonest, because the differences sit in items that decide the other three lines for the whole life of the set.
| Decision | What it decides later |
|---|---|
| Enclosure and acoustic level | Site acceptance, and whether residents or neighbours become a problem |
| Alternator and control panel make | Spares availability, lead time, and whether monitoring and paralleling stay possible |
| Rating declared, standby or prime | How hard the set may be worked, which sets the fuel and maintenance lines |
| Margin above the site de-rate | Whether the set runs at an efficient load or spends its life part-loaded |
| Documentation and certification | Whether the machine can be imported, insured and resold without rework |
None of these appears as a separate line on a quotation, which is exactly why they are worth asking about. A set specified for standby duty and then run as a prime power machine does not fail because it was badly built; it fails because it was bought for a different job. The distinction between the two ratings, and what each permits, is set out in prime and standby power.
The lines that never appear in a quotation
Several costs belong to the installation rather than to the machine, and they are easy to leave out of a budget because no single supplier owns all of them.
| Line | What drives it |
|---|---|
| Fuel storage and transfer | Bulk tank volume, bunding, transfer pump, and fuel polishing if it is stored for long |
| Exhaust and air path | Silencer, routing, ducting and louvres, and the pressure drop they add |
| Installation | Base and vibration isolation, cabling, switchgear, ventilation, and access for service |
| Spares holding | Filters, belts, hoses, sensors and a battery set, sized to the lead time you can tolerate |
| Diesel quality and testing | Storage duration and contamination, which reach the injection system first |
Two of these are worth arguing about at the specification stage. The first is the exhaust and air path, because a silencer and louvres chosen for cost rather than for pressure drop cost fuel on every hour the set runs, and the trade-off between noise and cooling is set out in noise standards and attenuation. The second is fuel storage, because a tank sized for the outage rather than for the delivery interval is a permanent constraint on how long the set can carry the site.
Downtime: the cost that has no invoice
Downtime is the line that never appears in a quotation and is usually the reason the machine was bought. It is also the line that is easiest to pretend away, because it is a cost of events that did not happen: outages carried, tests passed, a site that stayed open.
Its size depends entirely on what stands behind the set. For a standby set protecting a data hall or a hospital ward, the cost of a failure is measured against the value of the load, and no saving on fuel or maintenance is worth a reduced probability of starting. For a construction site with an alternative supply, the same failure costs a shift. The set is identical; the consequence is not, and the consequence is what should decide how much reliability is bought.
This is also why downtime and capital cannot be optimised separately. Redundancy, a second set, a better control panel, an automatic transfer arrangement and a load bank test each raise one line and lower another, and the only way to compare them is to put a value on the outage they prevent. Where that value cannot be stated, the honest assumption is that it is larger than the differences being argued over.
Standby and prime power are two different cost problems
The same set on the same site produces two completely different cost structures depending on the duty. This is the single most useful distinction in the whole calculation, and it is the one most often skipped.
| Cost line | Standby duty | Prime power duty |
|---|---|---|
| Capital | Usually the largest line by a wide margin | Spread over far more kWh, so smaller in relative terms |
| Fuel | Small, and often counted in hundreds of litres a year | Usually the largest line over the life of the set |
| Maintenance | Driven by the calendar more than by hours | Driven by hours, and by load quality |
| Downtime | The entire purpose of the purchase | A production loss with a measurable hourly rate |
| What improves the total | Start confidence, testing and spares on the shelf | Fuel efficiency, load discipline and correct sizing |
The practical consequence is that the two duties should be specified differently. A standby set is bought for the probability that it starts and carries; a prime power set is bought for the cost of every kWh it delivers, and the fuel line will outweigh everything the quotation argues about.
Building the number for your own site
The calculation needs six inputs and no software. Write them down first, because every one of them is a place where a guess will quietly decide the answer.
- Load profile. Not the peak figure, but the kW and the hours at each level, because fuel is consumed per kWh and not per hour.
- Fuel price and the delivered kWh. The litres per kWh for the size class, adjusted for the load the site actually runs at.
- Running hours per year, and the split between hours and calendar. The maintenance line is built from both.
- Capital, including installation. The set, the enclosure, the switchgear, the base, the cabling and the commissioning.
- The value of an outage. An hourly figure, even an approximate one, so that reliability can be compared with the other lines.
- Life and residual value. How many years the set will be kept, and what it is expected to be worth at the end.
Then the total is the sum of the lines, and the comparison figure is the cost per delivered kWh:
Cost per kWh = (capital + fuel + maintenance + consumables + installation + downtime – residual) / kWh delivered over the life
Comparing that figure with the local tariff is the honest test of whether a prime power set makes sense at all, and comparing it between two quotations is the only way to compare two machines that are not identical. The same discipline applies when the choice is not between two sets but between owning and renting, which is set out in rental and buying.
Where a used set changes the arithmetic
A used set moves one line and leaves the others where they are, which is the whole of its appeal and the whole of its risk. Capital falls, sometimes by half. Fuel does not move at all, because a litre of diesel costs the same in an old engine, and the maintenance line rises, because an older machine needs more attention rather than less.
What changes most is the distribution of outcomes. A new set has a narrow range of likely results and a warranty behind them; a used set has a wider range, and the purchase price is the payment for accepting it. That is why the inspection matters more than the discount, and the sequence that reveals the most before money changes hands is set out in used generator inspection. Documents are part of the same calculation: a machine that cannot be imported, insured or resold carries a cost that does not appear until it does, and what the papers cover is set out in export certification.
Where the duty is forgiving and the hours are low, the saving is real and the total is genuinely lower. Where the duty is continuous, the used set is being sold precisely because its remaining life is the thing being transferred, and the fuel and maintenance lines will not fall to match.
Questions we are asked
What is the biggest cost of owning a diesel generator?
It depends on the duty, and that is the useful answer. On a prime power set that runs for thousands of hours a year, fuel is usually the largest line over the life of the machine, and the capital cost is comparatively small per kWh delivered. On a standby set that runs a few dozen hours a year, capital usually dominates and fuel is a minor line. Comparing the two with a single figure is what produces misleading results.
How much fuel does a generator use per kWh?
Between about 0.24 and 0.29 litres per delivered kWh across the usual set sizes, and it depends more on the load than on the size. A 500 kVA set at full load delivers each kWh for about 0.253 L; at half load the same machine uses about 0.298 L per kWh, which is 18 % more for the same energy. The full tables by size and load are in the fuel consumption guide.
Is it cheaper to run a generator at part load?
It is cheaper per hour and more expensive per kWh. Litres per hour fall as the load falls, so the fuel bill for a given run looks smaller, but each kWh delivered costs more because a diesel engine loses efficiency faster than it loses load. Part load also causes wet stacking and faster oil degradation, which moves cost into the maintenance line.
How do I compare two generator quotations properly?
By comparing the machines rather than the prices. Check the rating declared, the alternator and control panel make, the enclosure and acoustic level, the margin above the site de-rate, and what documentation is included. Then convert both to a cost per delivered kWh over the expected life, including fuel, maintenance and the value you place on an outage. The cheaper quotation is often the more expensive machine.
Does a used generator have a lower total cost of ownership?
Its capital cost is lower and its fuel cost is the same, because diesel costs the same in an old engine. Its maintenance cost is usually higher and the range of possible outcomes is wider. On forgiving duties with low hours, the total is genuinely lower. On continuous duty, the saving on capital rarely survives the fuel and maintenance lines, and the set is being sold because its remaining life is what is changing hands.
How long should a diesel generator last?
Long enough that the life assumption drives the answer, which is why it should be stated rather than assumed. A well-maintained set on a good duty runs for many thousands of hours, and the major service at 2,000 to 4,000 hours is a scheduled event rather than the end of the machine. The variables that shorten it are part-load running, neglected cooling and fuel storage, not the age on the plate.
Send the load profile and the hours
Tell us the kW you need, the hours it will run and the duty it serves, and we will come back with the set, the fuel figures at your load points and the maintenance intervals that apply to it, so the arithmetic starts from real numbers.
Written and maintained by the KVA Grid sales engineering desk. The figures used on this page are the planning figures published elsewhere on this site: fuel consumption of about 0.24 to 0.29 litres per delivered kWh depending on set size and load, with a 500 kVA set at 101 L/h at full load, 80 L/h at 75 % and 60 L/h at 50 %; oil and filters at 250 to 500 hours or 12 months, a 1,000-hour band for valve clearance, filters and coolant testing, a major service at 2,000 to 4,000 hours, and an annual load bank test. Fuel prices, labour rates and electricity tariffs differ by market and are deliberately not quoted here; the method matters more than any single number inserted into it. This page explains a cost structure and is not a quotation, a financial forecast or advice on any specific project. Reviewed 2 October 2026.