A generator set shakes because it is a reciprocating machine, and that shake leaves the set by three routes: through the base into the structure, through the air as noise, and through everything bolted to it. The mounts and the foundation decide which of the three you end up fighting.

Where the vibration comes from, and the three paths it takes

A diesel generating set is a reciprocating engine bolted to a rotating alternator on a common base frame, and almost all of the vibration that reaches the building starts in two places. The first is the shaft: at 1500 rpm the crankshaft turns 25 times a second, and at 1800 rpm it turns 30 times a second. The second is combustion, and the firing frequency is the shaft speed multiplied by half the number of cylinders on a four-stroke engine. A four-cylinder set at 1500 rpm therefore fires at 50 Hz and a six at 75 Hz; the same arithmetic at 1800 rpm gives 60 Hz and 90 Hz.

Two consequences follow, and they explain most of the arguments this subject causes. The first is that the excitation sits in a fairly narrow band well above the shaft speed, so a mount selected on the shaft speed alone is usually adequate. The second is that there is almost nothing coming out of the engine below the shaft speed, which means a light or suspended floor with its own resonance down in the low single figures or the teens is the case that goes wrong, and it goes wrong in a way no amount of care with the engine will fix.

The vibration then leaves the set by one or more of three paths, and they are worth naming before any mount is bought, because each one has a different remedy and a different budget.

The three paths the vibration takes, how each one shows up on site, and what actually deals with it.
Path What carries it How it shows up What deals with it
Through the base frame The mounts, the plinth or block, the slab, and the soil or the steel frame below A room two floors away that hums, a crack at the plinth edge, anchor bolts that will not stay tight, a weeping flange on the fuel line The mounts and the foundation, sized as one decision rather than two
Through the air The enclosure panels, the louvres, the exhaust outlet and the openings The dB(A) figure at the boundary, and the complaint that arrives from outside the building The acoustic build, which is a separate problem with a separate budget
Through what is bolted on The exhaust, the radiator ducting, the fuel pipework, the cables and the conduit A cracked bellows, a chafed cable, a joint that weeps after a year, a support that has come loose A flexible connection at every interface, and supports that belong to the building rather than to the set

The three are regularly confused, and the confusion is expensive. A better silencer does nothing for a set whose vibration is travelling down a rigid exhaust support into a steel frame, and a spring mount does nothing for a set whose noise is leaving through an open louvre. Where the complaint comes from inside the same building, the path is almost always the first or the third; where it comes from beyond the site boundary, it is the second.

What an anti-vibration mount does, and what it cannot do

An anti-vibration mount is a spring element between the set and the world, and it has four jobs. It carries the static weight of the set with a known deflection at each point, so that no mount is overloaded and none is left hanging with no load on it at all. It keeps the set level and the alternator aligned under load, because a set that settles unevenly puts a bending stress into the base frame and a misalignment into the coupling. It lowers the natural frequency of the mounted system so that the excitation frequency is comfortably above it, which is the whole point of the exercise. And it survives the environment it is asked to live in: oil, heat, salt air, ultraviolet light on a roof, and the load case of being lifted, transported or dropped.

What a mount cannot do is just as important, because most of the disappointment in this subject comes from asking one to do something it was never able to do.

What people ask a mount to do, and why it cannot do it.
What is asked of the mount Why it does not follow
Make an airborne noise problem go away Structure-borne and airborne are two different paths. A mount interrupts the first and leaves the second exactly as it was
Rescue a soft, cracked or resonant floor The mount changes the force transmitted into the structure; it does not change the structure’s own resonance, and on a weak slab it simply moves the problem into the slab
Stand in for a foundation Every mount needs a level, load-bearing surface with a known floor loading. On anything less, the set finds the weakest point and stays there
Correct a misalignment Alignment is a shim and dowel job on the base frame. A mount used to correct it is being asked to carry a shear load it was not chosen for
Work without being selected for the load A pad that is too stiff passes vibration almost unchanged; one that is too soft bottoms out, or lets the set move enough to load the pipework
Compensate for a base frame that is not flat The frame has to be straight and the mounting points have to be coplanar before the mounts are set. Mounts cannot pull a twisted frame straight

One more thing belongs in this list, and it is the one that decides whether the isolation keeps working after the first year. A mount is a consumable, not a fixture. Rubber ages in heat and in oil, springs corrode and can be left fully compressed by a settling slab, and both are routinely re-tightened by a fitter who is trying to stop a rattle. Re-tightening a mount is not a repair; it bypasses the element and puts the vibration straight back into the frame.

Rubber pads, spring mounts and the choice between them

There are two families of mount on a generator set, and the difference between them is not the material. It is how far the element deflects under load, because the deflection sets the natural frequency of the mounted set, and the natural frequency is what decides whether vibration is amplified or blocked. The relationship is a simple one that a fitter can use on site: the natural frequency in hertz is about 15.8 divided by the square root of the static deflection in millimetres. Isolation begins when the excitation frequency is above about 1.4 times the natural frequency, and improves as the ratio rises.

Put numbers on that and the whole choice becomes visible. A rubber pad that deflects three to eight millimetres sits at a natural frequency of roughly 6 to 9 Hz, so it starts to isolate from about 10 Hz upwards. A steel spring that deflects 25 to 50 millimetres sits at roughly 2 to 4 Hz, so it starts to isolate from about 4 Hz upwards. Both are comfortably below the shaft speed of 25 or 30 Hz and the firing frequency of 50 to 90 Hz, which is why both work on an ordinary set. The difference opens up when the structure underneath has resonances of its own down in that lower band, and that is exactly the situation on a suspended slab, an upper floor or a roof.

Rubber pads and steel springs compared. Deflection and frequency are planning figures, not a limit; the mount supplier’s data governs the selected part.
Item Rubber pad or block Steel spring mount
Typical static deflection A few millimetres Tens of millimetres; 25 to 50 mm is common
Natural frequency it gives Roughly 6 to 9 Hz Roughly 2 to 4 Hz
Isolates from about 10 Hz upwards 4 Hz upwards
Where we put it A stiff ground slab, a ground-bearing industrial floor, a container floor, a trailer chassis; rubber pads for most sites A suspended slab, an upper floor, a light structure, or a plant room above or beside occupied space; spring mounts where the structure is light or the machine is on an upper floor
What it needs to work A level, flat, load-bearing surface, and a pad that is not in shear and not over-compressed The correct load per spring, and a check that no spring is fully compressed or fully extended
What it costs you Less height and less money, and less isolation in the low band More height, more cost, and more care every time the set is lifted or moved

The practical rule that follows is short. On a set standing on a competent ground slab, rubber pads are the right answer and springs usually buy nothing except height and cost. Where the structure below is light, or the set is on an upper floor, or the room shares a slab with occupied space, the low-frequency part is the part that matters and springs are the answer. Height is the detail that catches people out: a spring mount needs vertical travel, so the set sits higher, the base tank clearance changes, and any pipe or duct that reached before may now need a different length.

The third option is used less often than it should be, and it is free. Move the set. Distance and a different room do more for structure-borne noise than any mount, and the decision is taken at layout stage or not at all.

Plinth, inertia block and the floor underneath

A mount cannot be bolted to nothing, and what it is bolted to is where the second half of this decision lives. There are two arrangements in common use on this site, and the figures we quote for them are the same ones that appear on the open frame page.

An isolated plinth and a rigid inertia block, and when each one is the answer.
Item Reinforced plinth on mounts Rigid inertia block
Mass, as a starting figure Commonly about the set weight for an isolated plinth Commonly 1.5-2 times the set weight
What it is for A level, load-bearing surface, a fixed geometry and something the anchor bolts can hold Mass that lowers the natural frequency of the whole mounted system and absorbs the dynamic component before it reaches the structure
Where it belongs A stiff ground slab or a ground-bearing industrial floor Where the structure is light, where the machine is on an upper floor, or where structure-borne noise is the concern
What it needs The floor loading checked, a level top, and a surface that drains The same, plus a foundation design that accounts for the dynamic component and not only the static weight
What it costs Concrete, curing time, and a plinth the set cannot easily be moved on More of all three, and the decision cannot be taken after the slab has been poured

Two site figures show how much the answer depends on the machine. A 400 kVA canopy set is normally bolted to a concrete plinth with anti-vibration mounts, and the plinth is sized for the static weight of roughly 3.5 to 4.5 t plus the fuel. On a 2000 kVA machine it is the static weight plus the dynamic loading that drives the foundation design, and the radiator airflow of a machine that size is usually handled with remote cooling or ducted discharge, which changes the layout long before the foundation is poured. The number that has to appear on the drawing is the floor loading, in the place the foundation will actually be, and it has to be confirmed by the structural side rather than assumed from the set’s weight.

An open set inside a building makes the same point from the other direction. There the room is the enclosure, so the sound the set makes through the air is the room’s problem, and the vibration it makes is the building’s. A room built for a five tonne set that later receives an eight tonne one is a foundation question before it is anything else, which is why the foundation, the plinth or the inertia block and the floor loading belong in the same conversation as the airflow and the heavy-lift route.

Two details decide whether the concrete does its job. The first is flatness: the mounting points have to be coplanar to the tolerance on the drawing, because a plinth that is out of level puts a permanent bending stress into the base frame and shows up later as a coupling problem or a cracked weld. The second is drainage. A plinth that holds water under the base tank corrodes the tank from underneath, which is the single most expensive panel on the set to replace.

What has to stay flexible: exhaust, ducting, pipework and cables

An isolation system is only as good as its most rigid connection, and on a generator set there are usually five or six of them. Everything that runs from the set to the building is a potential bridge that carries the vibration straight past the mounts, and the bridge does not have to be heavy to matter: a rigid exhaust support, a bracket on a fuel pipe or a conduit clamped to a wall will do it.

The exhaust is the one that fails most often, because it is hot, it grows when it heats up, and it is usually supported from whatever is nearest. The arrangement that works is insulated pipe with an expansion bellows, a silencer, and a back pressure within the engine maker limit, discharging above roof level. The bellows is only doing its job if it is still free to move, which means the silencer’s weight has to be carried by the building rather than by the engine, and the supports either side of the bellows have to allow the pipe to grow without compressing it.

The radiator duct is the second. Where the set is ducted to a louvre, what it needs is a flexible duct or a canvas sleeve from the radiator to the discharge louvre, so that the set’s own vibration is not transmitted into the wall and the duct does not load the radiator. The full ducting arrangement, including the blanking plates that stop air short-circuiting back into the room, is set out in generator room design. The same section is where the heavy-lift route belongs, because a duct that is bolted rigidly to both the set and the wall is also the reason the duct has to be dismantled before the radiator can be changed.

The interfaces that carry vibration past the mounts, what goes wrong at each one, and what to specify.
Interface What goes wrong What to specify
Exhaust pipe at the manifold or the silencer The bellows is compressed, stretched or sheared by thermal growth, then cracks at the convolution A flexible stainless bellows sized for the movement it has to take, not simply the nearest available size
Silencer supports The silencer hangs on the set and short-circuits the whole isolation system Independent supports or spring hangers belonging to the building, sized for the silencer and its insulation
Radiator discharge duct The set’s vibration is transmitted into the wall, and the duct loads the radiator outlet A flexible duct or a canvas sleeve, with blanking plates so air cannot spill around it and short-circuit
Fuel pipework A weeping joint, or a fatigue crack at the first rigid support after the set Flexible hose at the set, and pipework supported from the building with its own expansion allowance
Cables and conduit A chafed cable or a cracked gland, and a rigid route for vibration into the switchgear enclosure A service loop or a flexible section at the set, and a gland plate that does not carry load
Base tank fill, drain and gauge The same fatigue, in a place that nobody inspects because it is under the set Flexible couplings at the set, and the fixed pipework independently supported and drained

Where the set is quiet and the noise complaint comes from inside the building, this table is usually the answer rather than the mount specification. In the noise measures we rank for a site, vibration isolation sits behind the silencer, the enclosure lining and the sealing, and ahead only of the smaller items, but its limit is stated the same way: a good isolation system that is bridged by one rigid pipe is not an isolation system.

Container, trailer and roof: the same problem in three other shapes

The same machine behaves differently depending on what it is standing on, and three of the common arrangements need a sentence each because the mount that suits one is the wrong answer on another.

A containerized set is delivered with the engine, alternator and base frame on anti-vibration mounts, bolted to the container floor. That floor is a stiff, relatively light panel compared with a slab, and a stiff light panel is an efficient radiator of sound, which is why a container that is not lined is a poor acoustic enclosure no matter how well the set itself is isolated. On site the container is landed on a level, drained concrete plinth or hardstanding and secured against wind and, in seismic areas, against lateral movement. The detail that undoes it is bolting the set’s frame straight through the container floor onto the rigid plinth below: that bypasses the mounts entirely, and the container stops being part of the isolation and becomes part of the problem.

A trailer-mounted set is isolated by its road suspension, which is leaf spring or rubber depending on the build, and the axle rating has to exceed the plated mass with margin for the fuel load. That arrangement is correct for a set that moves. It is the wrong arrangement for a set that stays, because the suspension is being asked to work as a permanent mount under a load it was designed to carry on the road: for a site that will keep the set for more than about a year, the trailer is usually lifted off and the set is landed on a plinth, with the trailer stored. Towing a set on and off a site repeatedly wears the canopy mountings and the trailer brakes faster than the generator wears out, which is the same lesson from the other direction.

A roof or an upper-floor plant room is the hardest case, and it is the one where the structure rather than the machine decides the answer. The slab is light, it spans, and it has its own resonances low down in the band where a spring mount does its work. It is also the case where the occupied space is directly underneath and the acoustic path is short. The order of the answer is fixed: distance first, isolation from the structure second, and enclosure third.

The three arrangements that are not a canopy on a ground slab, and what changes in each one.
Arrangement What isolates the set What the surroundings add The thing that goes wrong
Container on a plinth or hardstanding The set’s own mounts, inside the box A stiff, light floor that behaves as a panel, and a box the air path has to get through The set bolted straight through the container floor to a rigid plinth, which bypasses the mounts
Canopy set on a trailer The road suspension, and the tyres Tyre stiffness that changes with load and pressure, and a chassis that was designed to move A set left on its trailer for years: the suspension and the canopy mountings take a permanent load they were not chosen for
Plant room on a roof or upper floor Spring mounts, and often an inertia block of 1.5-2 times the set weight A light, long-span structure with resonances of its own, and occupied space directly below Isolation chosen on the shaft speed alone, when the slab is the item that is resonating

One arrangement deserves a warning rather than a table. Where the set is mounted on a structure that also carries pipework, cable trays or ductwork belonging to other plant, the vibration enters those services and travels much further than the set’s own footprint. The services are then the source of a complaint in a room the set has nothing to do with, and the answer is a flexible section at the set rather than anything done to the machine.

Why vibration reaches the bedrooms before it reaches the machine

Vibration damages a set slowly, and it damages a building’s reputation quickly. A structure is a far better conductor of low-frequency energy than air is, which is why the first sign of a mounting problem is usually a complaint from a room that has no line of sight to the set and no obvious reason to hear it.

On a hotel or a residential project the mechanism is worth stating in one line, because it explains why the same machine is acceptable on an industrial plot and unacceptable here, and why the answer is a structural decision rather than an engine one. Equipment on the same slab as occupied space puts more into that space through the structure than a set standing in the yard puts into the air. A canopy set in a yard a hundred metres away can be quieter at the bedroom than a set on the floor below, and the only things that change the outcome are distance and isolation.

For a set in the building, the delivered answer is the same list in the order that pays: put the set as far from occupied rooms as the building allows, isolate it from the structure so that vibration does not travel through the floors, and enclose it acoustically so that the airborne path is controlled. The full attenuation package, and the reason a silencer and a mount solve different halves of the problem, is set out in generator noise standards and attenuation; the accommodation side of the same decision is set out in diesel generators for hotels.

The machine-side damage is slower and duller, which is exactly why it gets ignored. A set that vibrates for years loosens fasteners, chafes cables, fatigues the first rigid support on every pipe, and eventually cracks the base frame or the exhaust at a weld. None of it appears suddenly, none of it appears on a datasheet, and all of it appears on the maintenance sheet as a series of small jobs that were each treated as bad luck.

What we specify for a foundation and mounts

This is an illustrative specification, not a delivered project. It shows how the set, the structure and the occupied space turn into a foundation and a mount schedule. Replace the figures with your own site data before pricing.

Example: a 500 kVA standby canopy set in a ground-floor plant room, where the rooms above share the same slab.
Item Example specification Why it is written that way
Duty and running speed 500 kVA standby at 1500 rpm, six cylinders: shaft at 25 Hz, firing at 75 Hz The two frequencies the mounts have to sit below are fixed by the machine, and they are the same on every site
Floor loading The set, the plinth or block and the fuel calculated against the structural drawing before anything is sized The floor is the item that decides between rubber and springs, and it is the one that never appears in a quotation
Foundation Reinforced concrete plinth, top level and coplanar to the tolerance on the drawing, drained at the low point A plinth that holds water corrodes the base tank from underneath, and the base tank is the most expensive panel on the set
Inertia block A rigid block at 1.5-2 times the set weight, because the room shares a slab with occupied space On a light or suspended floor the mass is what lowers the natural frequency of the whole mounted system
Mounts Spring mounts giving roughly 25-50 mm of static deflection, loaded evenly, with no spring fully compressed A suspended slab has resonances of its own in the low band, and the low band is where a spring does its work
Setting and alignment Shims or levelling nuts left accessible, and the set checked level after it is under load A set that settles unevenly bends the base frame and puts a misalignment into the coupling
Exhaust Insulated pipe, a stainless expansion bellows, a silencer carried by the building, and a back pressure inside the engine maker limit A silencer hung on the set bypasses every mount on the machine, and the bellows is what takes the thermal growth
Ducting and pipework A flexible or canvas sleeve from the radiator to the louvre, and a flexible hose at the set on the fuel line The duct and the fuel pipe are the two bridges that are added on site after the isolation has been designed
Handover reading A vibration reading taken at the set and in the room above, with the machine running on load The complaint, when it comes, comes from the room and not from the machine, so that is where the reading belongs

Notice what is not on that list: a mount part number. The part is the last item to be chosen and the easiest to change, and the drawing it sits on – the plinth or the block, the level, the anchor positions and the floor loading – is what has to be settled first. Once the layout is fixed and the floor is confirmed, the mount selection is a calculation with the set weight and the number of mounting points as its inputs, and it is a short one.

What to check at handover

Foundation and isolation work is invisible once the set is running, which is why it is worth checking deliberately rather than waiting for a complaint. These are the seven items we work through at handover, and they sit alongside the general site acceptance checks on the set itself.

What to check on the foundation and the isolation at handover, and what each check is really confirming.
Check What is being confirmed Who carries it out
The foundation and the mounts, against the drawing Plinth or block size and level, mount type and position, every fixing present and torqued, and no shim missing or doubled up The site engineer, with the foundation drawing in hand
Vibration, at the set and in the occupied room That the excitation is where it should be and that the structure is not being driven; the reading in the room is the one that matters The commissioning engineer, with the building quiet
The exhaust route and the back pressure Bellows fitted and still free to move, silencer carried independently, insulation complete, measured back pressure inside the engine maker limit The commissioning engineer, against the engine data
Fuel pipework and tank Tank standing on its base, pipework supported from the building, a flexible section at the set, and no weep at full head The site and commissioning engineers together
Cooling air in and out Radiator duct flexible and not loading the radiator, air able to enter and leave, and the room ambient close to what was assumed The commissioning engineer, with the room closed up
That the isolation is not short-circuited Nothing rigid bridges the flexible elements: no bracket added on site, no conduit clamped to the wall, no duct bolted at both ends The site engineer, by walking the route from the set outwards
The anchor bolts after the first run-in That nothing has loosened while the set bedded in, and that the fixings are treated as a routine rather than a repair The service engineer, at the first scheduled visit

The vibration and acceptance checks on the set itself – the fuel system, the cooling air, the exhaust and the load test – are set out in factory test and site acceptance, and the two lists are meant to be used together. A set can pass every electrical and load check and still be a building problem, and that is the failure this page exists to prevent.

The mistakes that cost the most

The expensive mistakes here are made at layout stage, and most of them are made by choosing the machine’s answer to a problem that belongs to the building.

The mistakes that cost most on a generator foundation or isolation scheme, and what prevents each one.
Mistake What it costs What prevents it
Choosing the mounts before the floor is checked A mount selected on the shaft speed alone, sitting on a slab that resonates in the same band; the isolation can make the room worse than no isolation Get the floor loading and the slab construction first, then select the mount against both
Bolting the exhaust or the duct rigidly at both ends Every mount on the set bypassed by one bracket, and a complaint from a room the set does not stand near Walk the route from the set to the wall and confirm that every crossing is flexible and every support belongs to the building
Sizing the inertia block on the set weight alone A block added to a light slab that lowers the natural frequency into the excitation band instead of away from it Design the block with the structure, as one system, with the dynamic component in the calculation
Treating the plinth as the foundation A timber-pallet-thick slab under a set that weighs 4 t, cracking at the edge and damaging the base frame Reinforced concrete to a drawing, with the thickness and the reinforcement stated rather than implied
Leaving a set on its trailer as a permanent installation Load carried for years by suspension that was chosen for the road, and by canopy mountings that were never designed for it Lift the set onto a foundation or a plinth for anything beyond a short stay
Anchoring a container set through the container floor The mounts inside the box bypassed, and the container floor turned into the vibrating element Anchor the container at its corner castings and leave the internal mounts to do their work
Writing a vibration clause with no measurement point Nothing to check at handover, and no way to tell a real problem from a nuisance once the building is occupied Name the place and the condition: a reading at the set, a second reading in the nearest occupied room, both on load
Chasing the engine when the complaint is structural Balancing and re-shimming bills on a machine that was never the source of the noise in the room Separate the three paths first, and treat the structure-borne path with distance and isolation

One pattern runs through all eight. The set is the constant in the problem and the building is the variable, so a specification that stops at the set has not answered the question the site will ask. The same order applies on a rooftop plant room, in a hotel basement and on a container standing at a port: distance first, isolation from the structure second, and the acoustic build third.

Questions about generator vibration and foundations

Do I need spring mounts or rubber pads?

It depends on what the set is standing on rather than on the set. On a competent ground slab or a ground-bearing industrial floor, rubber pads are the answer on most sites; where the structure is light, where the machine is on an upper floor or a roof, or where the room shares a slab with occupied space, spring mounts are the answer even though they cost more and raise the set. The number that decides it is the natural frequency the slab reaches under load, not the size of the machine.

How do I tell whether my floor is the problem?

By where the complaint is rather than by how loud the set is. If the noise is audible in a room with no line of sight to the set, and it gets worse on a particular floor or at the far end of a corridor, the energy is travelling through the structure. A simple check confirms it: a reading taken on the slab beside the set and the same reading taken in the room above, at the same load, will tell you whether the path is structural.

How heavy should an inertia block be?

A rigid inertia block is commonly taken at 1.5-2 times the set weight, and it earns its place where the structure is light, where the machine is on an upper floor, or where structure-borne noise is the concern. Where the set stands on grade on an isolated plinth, a mass of roughly the set weight is the usual starting figure. The block is a mass on a spring, so adding it without checking the floor can move the whole system into the band you were trying to avoid.

Is a rubber mat under the set enough?

Only where the slab is stiff and the set is small enough that the pad still deflects under it. A pad that is over-compressed stops behaving as a spring and passes vibration almost unchanged, which is why the pad has to be selected against the load per mounting point rather than cut from a roll. On a suspended floor a mat will not reach the low band that matters, whatever its thickness.

Does an enclosure or canopy deal with the vibration?

No, and the two problems are usually solved by different trades. An enclosure deals with the airborne path; the set inside it still has mounts under the base frame, and the canopy adds weight that the mounts and the plinth have to carry. A canopy set is around 8-15 % heavier than the same machine in open form, which is a foundation input rather than a detail.

Can isolation make vibration worse?

It can, and the mechanism is worth knowing. Every mount turns the set into a mass on a spring with a natural frequency of its own, and a soft mount gives a low one. If the excitation frequency is too close to it, or if the floor has a resonance in the same band, the isolation amplifies rather than blocks. That is why the deflection on the mount datasheet and the construction of the slab have to be read together, and why a soft mount also needs flexible exhaust, duct and pipe connections to be free to move.

What do you need in order to quote the mounts and the foundation?

Six things: the set size and its running speed, so the excitation frequencies are known; the weight, and whether the machine is enclosed; where the set will stand, with the slab or floor construction and whether it is on grade or an upper floor; the distance to the nearest occupied space and whether it shares the slab; how the exhaust, the duct and the fuel line will be routed; and any vibration or noise limit that applies at a particular point. Those six answers fix the mount type, the plinth or block and the loading figure that has to be confirmed by the structural side.

Send the foundation drawing, not only the kVA

Tell us what the set will stand on, which floor it is on and what is above it, and how far the nearest occupied room is. The reply carries the mount type, the plinth or inertia block, the loading figure to be confirmed by your structural side, and the flexible connections that have to be kept.

Request a quote WhatsApp the sales desk

Written and maintained by the KVA Grid sales engineering desk. The foundation and isolation figures on this page – a reinforced concrete foundation, an isolated plinth of about the set weight, a rigid inertia block at 1.5-2 times the set weight, rubber pads for most sites and spring mounts where the structure is light or the machine is on an upper floor, and an insulated exhaust with an expansion bellows, a silencer and a back pressure inside the engine maker limit – are the values published on the open frame range, the silent range, the containerised range and the trailer-mounted range, and in generator room design, generator noise standards and attenuation, factory test and site acceptance and diesel generators for hotels. The weights quoted as examples – roughly 3.5 to 4.5 t for a 400 kVA canopy set, and 6 to 12 t for a 20 ft containerised set – are the figures published on the 400 kVA and 2000 kVA pages and on the containerised range. The relationship between static deflection and natural frequency is the standard approximation used by mount suppliers, whose own data governs the selected part; ratings follow ISO 8528-1 and the intervals in the maintenance schedule. The floor loading at a particular site and the buyer’s own specification govern what is built. This page describes general practice rather than a particular rule, and nothing on it is a quotation for a particular project. Reviewed 16 October 2026.