Generator voltage and phases: 380 V, 400 V or 415 V, and single or three phase


A generator set is ordered against two numbers that are not the same number: the voltage between two phases, and the voltage between a phase and the neutral. For a 400 V set those are 400 V and 230 V, and the ratio between them is fixed at 1.732. The three 50 Hz voltages that turn up in enquiries – 380 V, 400 V and 415 V – are not three different machines. They are the same alternator wound, connected or trimmed differently, and the choice has to be made before the alternator is ordered, because it sets the winding, the cable size and the protection settings.

Line voltage and phase voltage are two different numbers

A three phase set with a neutral gives two voltages at the same time, and both are quoted on the same data sheet. The larger number is measured between any two of the three phase conductors. The smaller is measured between one phase conductor and the neutral. The ratio is not adjustable and not a rounding: the line voltage is 1.732 times the phase voltage, because 1.732 is the square root of three, and the three phases are 120 degrees apart.

That is why the same supply is written as 400/230 V, or 415/240 V, or 480/277 V. The first figure is line to line, the second is line to neutral, and the two are always quoted together because a site needs both. Three phase motors, chillers and air handling take the line voltage. Lighting, sockets, controls and small power take the phase voltage.

The paired voltages, and the ratio between them. Every pair below is one line voltage with its phase voltage, differing by 1.732.
System Line to line Line to neutral Frequency
IEC and European harmonised 400 V 230 V 50 Hz
Older European and legacy IEC projects 380 V 220 V 50 Hz
Legacy British standard 415 V 240 V 50 Hz
West and Central Africa, legacy Gulf networks 440 V 254 V 60 Hz
North American industrial and data centre 480 V 277 V 60 Hz
North American small commercial 208 V 120 V 60 Hz
Canadian industrial 600 V 347 V 60 Hz
Brazil 220 V 127 V 60 Hz

A set built without a neutral is a three wire machine. It has no line to neutral voltage at all, so it cannot feed the single phase part of a site. That is why almost every building set is ordered three phase, four wire, with the neutral brought out to the terminal box.

380 V, 400 V and 415 V are one machine wound and trimmed differently

These three are the 50 Hz figures that appear most often in export enquiries, and they are close enough that they are frequently treated as interchangeable. They are not interchangeable on paper, and the difference is small enough that the wrong one is easy to buy by accident.

400 V is the harmonised IEC and European value, and the default for the Gulf, Africa and most of Asia. 380 V is the older European value, and it still appears in projects written to legacy specifications, including much of the former Soviet and Chinese export market. 415 V is the legacy British value, and it is still written into tenders by clients whose standards were set under British practice, which is common in Nigeria, Kenya and older Gulf specifications.

The gap between the three is a few percent, and that is exactly why the mistake is made.

The three 50 Hz values against 400 V. All three sit inside a band of plus or minus 5 %, which is why they look interchangeable and why they are not.
Voltage Against 400 V Where it comes from What to order
380 V 5 % below Older IEC and European installations, and legacy export specifications A 380 V nameplate, or a 400 V build trimmed down on the regulator and re-tested
400 V Baseline Harmonised IEC, and the default in the Gulf, Africa and Asia at 50 Hz A 400 V nameplate; this is the standard build
415 V 3.8 % above Legacy British standard, still written into many tenders A 415 V nameplate where the tender says so; a trimmed 400 V build only if the client accepts it in writing

A modern automatic voltage regulator has a trim range of roughly 5 % either side of nominal, so a 400 V set can be set to 380 V or to 415 V and will hold it under steady load. That is a trim, not a re-rating. The winding, the insulation, the cable, the breaker and the protection settings were chosen against the nameplate voltage, and a set that is set far from its nameplate has to be re-tested and re-labelled rather than simply adjusted.

Where a tender specifies 415 V, the honest answer is a 415 V build. Where a site runs at 415 V because that is what the local supply is, a 400 V set trimmed up is usually acceptable and is what most suppliers ship. The difference worth arguing about is not the few percent of voltage. It is whether the quotation says which one is being supplied.

Which voltage belongs to which market

The destination decides the voltage, and it usually decides it twice: once for the utility supply the site runs on, and once for the standard the tender was written to. Where the two disagree, the tender governs, because the acceptance test will be run against it.

Voltage and frequency by market, at the level of detail that matters for an order. The frequency fixes engine speed; the voltage fixes the alternator winding.
Market Voltage Frequency
Europe, the Gulf and most of Asia 400/230 V 50 Hz
Specifications written to legacy UK standards 415/240 V 50 Hz
Saudi Arabia 400/230 V 60 Hz
United States, industrial and data centre 480/277 V 60 Hz
United States, small commercial 208/120 V 60 Hz
Canada, industrial 600/347 V 60 Hz
Brazil 220/127 V, and 380/220 V 60 Hz

Voltage and frequency are one decision, not two. The iron in a motor or a transformer responds to the ratio between them: 400 V at 50 Hz and 480 V at 60 Hz are both 8 volts per hertz, which is why they behave alike. Which countries use which frequency, and what a mismatch does to motors and pumps, is set out in 50 Hz vs 60 Hz. The voltage half of the same pairing is what this page covers.

Single phase or three phase: the load decides

Single phase is not a smaller version of three phase. It is a different way of connecting the load, and it stops being the right answer somewhere between about 5 kVA and 10 kVA.

Below that a single phase set is a reasonable build. The load is lighting, sockets, a small pump or a shop, the cable is manageable, and the machine is small enough that starting current is not the controlling problem. Above that, three phase takes over for three reasons that all point the same way. The current per phase for the same kVA is 1.732 times lower, so the cable and the breaker are smaller. Three phase motors of the same power are smaller, cheaper, and start with a rotating field rather than with a start winding and a capacitor. And the load can be spread across three conductors instead of one, so the neutral does not have to carry the whole site.

What usually decides the phase arrangement, and where the boundary sits.
Load Usual answer Why
Domestic or small shop standby, up to about 5 to 10 kVA Single phase, 230 V The load itself is single phase, and a three phase set would only be asked to carry one leg
Three phase motors above roughly 2.2 kW Three phase A smaller frame for the same power, better starting torque, and lower current per phase
Chillers, pumps, lifts and air handling Three phase Almost all building plant above the smallest sizes is three phase
A site with both kinds of load Three phase, four wire The single phase loads are spread across the phases, and the neutral carries the difference

The sets on this site start at 100 kVA, so every one of them is three phase, four wire. Single phase is a special build rather than a catalogue item, and it is worth saying so plainly when an enquiry arrives asking for a small single phase standby set, because the load arithmetic in how to size a diesel generator is written for three phase loads.

Three phase four wire, and what the neutral carries

In the star connection used for almost every set, the three windings meet at a common point, and the neutral is that point brought out to the terminal box. Its job is to carry the current that does not cancel.

With a perfectly balanced load on all three phases, the three phase currents are equal and 120 degrees apart, they cancel at the star point, and the neutral current is close to nothing. Real sites are not balanced. Lighting and sockets are single phase by nature, and they are never spread evenly. As the load moves onto one phase the neutral carries more, and in the limiting case – one phase fully loaded and the other two dead – the neutral current equals the phase current.

What the neutral carries, and why the neutral conductor is not reduced on a set.
Condition Current in the neutral Consequence
Three phase load, balanced Close to zero The neutral is there for safety and for single phase loads, not for current
Single phase loads spread evenly A fraction of one phase The normal case in a building, and nothing has to change
One phase much heavier than the others Up to the phase current The alternator is sized on the loaded leg rather than on the total, so the usable capacity falls
Line to line loads only, no neutral used Zero Motors and chillers fed line to line are invisible to the neutral

Two practical rules follow. Spread the single phase loads so that the three phases stay within roughly 10 % of each other, and declare the spread in the enquiry rather than discovering it after delivery. And size the neutral as a full phase conductor. On a generator supply the harmonics and the imbalance both push current into the neutral, so a reduced neutral that would be acceptable on a utility feed is the wrong economy on a set.

What the voltage decides downstream: current, cable and switchgear

Once the voltage and the phase arrangement are fixed, the current falls out of them, and the current is what the rest of the electrical package is bought against. For a three phase load, the current per phase is the kVA multiplied by 1000 and divided by 1.732 times the voltage.

Current per phase at the three 50 Hz voltages. The same kVA draws about 9 % more current at 380 V than at 415 V, which is enough to move a cable size and a breaker rating.
Rating 380 V 400 V 415 V
100 kVA 151.9 A 144.3 A 139.1 A
200 kVA 303.9 A 288.7 A 278.2 A
500 kVA 759.7 A 721.7 A 695.6 A
1000 kVA 1519.4 A 1443.4 A 1391.2 A

The difference looks small and is not. At 500 kVA the spread between 380 V and 415 V is about 64 A, which is the difference between one breaker frame and the next, and it is the kind of margin that disappears when the cable run is long or the ambient is hot. The same kVA is the same kVA at every voltage; what changes is the current, and the current is what the copper, the breaker and the transfer switch are chosen against. Rating pages such as 500 kVA diesel generators and 1000 kVA diesel generators carry the voltage and phase options for those classes. How the kVA and kW figures relate, and why a set is sold in kVA but loaded in kW, is set out in kVA vs kW.

The transfer switch is part of the same decision. A three phase four wire supply needs a four pole transfer switch if the neutral is to be switched, or a three pole switch with a solid neutral if it is not, and which of the two is correct depends on the earthing arrangement rather than on the set. The difference between the switch and its controller is set out in ATS vs AMF. Where two sets are run together, the voltage, the phase rotation and the frequency have to agree before the paralleling controls are worth buying, as set out in generator paralleling.

Where that current goes next is a cable and breaker decision rather than a voltage decision. The full load current per phase, the temperature and grouping corrections that reduce the usable capacity, the voltage drop over the route and the breaker setting that co-ordinates with the alternator are worked through in generator cable sizing and voltage drop.

How one alternator covers more than one voltage

An alternator is not a fixed voltage device. It is a set of windings, and the voltage is decided by how those windings are connected and how many turns are in series. Most alternators above the smallest sizes are supplied as twelve lead machines: six winding ends are brought out on each side, so the links in the terminal box can be arranged in more than one way.

The practical result is that one alternator frame can be quoted over a band of voltages, and a machine ordered for 400 V can often be delivered with a terminal link arrangement that also offers 380 V or 415 V. Where a wider range is needed, an alternator fitted with a voltage selector switch gives two or three settings that can be changed on site.

What changes when an alternator is reconnected, and what does not.
Item Effect of reconnection
Rated voltage Set by the link arrangement, and it has to be re-labelled on the nameplate
Rated current Moves with the voltage: a connection at a lower voltage delivers more current for the same kVA
kVA rating Unchanged; it is the same machine
Frequency Unchanged; frequency is set by engine speed and not by the winding
Protection settings Have to be re-set to the new voltage and current, or the set will trip or fail to protect
Tests and documents Repeated at the new voltage, with the test sheet reissued

Reconnection is a factory or authorised service task, not a field adjustment. The links carry the full current of the machine, the arrangement has to match the winding diagram for that specific alternator, and the change invalidates the nameplate until it is reissued. A quotation that offers a wide voltage range should say which arrangement is being supplied and what the nameplate will read.

What voltage regulation actually holds

The nameplate voltage is what the set holds, not what it produces at every instant. Two moments matter. Steady state is what instruments read once the load has settled. Transient is what happens in the second after a large motor starts.

In steady state a modern automatic voltage regulator holds the output within about 1 % of the set point across the normal load range, and the set point itself can be trimmed a few percent either side of nominal. That is the number that matters for electronics and for lighting, and it is a much tighter band than a utility supply usually delivers.

Transient behaviour is a different question, and it is usually the one that decides whether a project works. When a large motor starts, the current it draws is several times its running current, and the alternator output dips before the regulator can respond. How far it dips depends on the alternator rather than on the regulator: a machine with a low subtransient reactance holds its voltage better on a motor start, and that is a specification worth asking for when the load list contains a large direct-on-line motor. A dip of 10 to 15 % is normal on a well matched set. A dip beyond that is what makes contactors drop out, drives trip and lights blink, and it is a sizing and alternator selection problem rather than a voltage problem.

Where the load is sensitive, the answer is usually to start the motor in a softer way – star delta, a soft starter or a variable speed drive – rather than to buy a larger alternator, and the choice between those is a load study rather than a voltage question. The current a motor asks for at the first instant, the kVA that becomes and how far each starting method reduces it are set out in generator starting current and motor starting. Voltage readings that step out of band in service are a fault rather than a design issue, and the order to check them in is set out in diesel generator troubleshooting.

Mistakes that cost money

  • Ordering the supply voltage from memory. The voltage at the site and the voltage in the tender are two different things, and only one of them is accepted at commissioning. Read the incoming supply, read the specification, and write both into the enquiry.
  • Treating the regulator trim as a re-rating. A few percent of trim is a fine adjustment. A machine whose nameplate no longer matches its setting has protection that no longer matches the machine, and that is a commissioning finding rather than a saving.
  • Assuming a used set is matched to the site. Voltage, phase and frequency are the three things a photograph cannot show, and a set re-badged to the wrong voltage is one of the costliest ways to buy second hand, as set out in used diesel generator inspection.
  • Confusing the declared rating with the duty. The voltage is fixed by the winding, but the rating is fixed by the duty, and a set declared for standby and then run as a prime power machine will not meet its own figures. The two ratings and what each permits are set out in prime and standby power.
  • Buying the voltage without the paperwork. A set reconnected after the factory test needs its nameplate, its test sheet and its declaration reissued, and the documents that have to travel with the machine are set out in generator export certification.
  • Sizing on kVA alone. A kVA figure is meaningless until it is paired with a voltage and a phase arrangement. The rating ranges, from 500 kVA to 1000 kVA, are quoted at one voltage and one frequency, and the same rating at another voltage is a different cable, a different breaker and sometimes a different alternator. How the range as a whole is organised is set out in the diesel generator category guide.

Questions we are asked

What is the difference between 380 V, 400 V and 415 V?

They are three values of the same 50 Hz three phase supply, and any of them can be produced from the same alternator by connection and trim. 400 V is the harmonised IEC and European value and the default in the Gulf, Africa and Asia. 380 V is the older European value and still appears in legacy specifications. 415 V is the legacy British value and is still written into many tenders. The gap is a few percent, but the nameplate, the cable and the protection settings are all chosen against one of them.

Is 400 V the same as 415 V?

No. 415 V is 3.8 % above 400 V, and both sit inside the band of plus or minus 5 % that a set is normally allowed to hold, which is why they are often treated as interchangeable. A regulator can trim a 400 V set up to 415 V and hold it, and on a site that is simply supplied at 415 V that is usually acceptable. Where the tender says 415 V, the correct answer is a 415 V nameplate, because acceptance is tested against the specification rather than against what the regulator can reach.

Can a 400 V generator supply a 415 V site?

In most cases yes, by trimming the regulator, provided the site accepts a 400 V nameplate. The voltage will be held within the regulation band at the new setting and the set will carry the load. What changes is the paperwork: the nameplate, the protection settings and the test sheet should match the voltage at which the machine is actually run, and a set ordered for 415 V avoids the argument entirely.

Does a generator produce single phase or three phase?

Both are possible, and the phase arrangement is decided by the load rather than by the machine. Single phase sets are built for small standby duties, typically up to about 5 to 10 kVA, where the load is lighting, sockets and small pumps. Above that, three phase is standard: the current per phase is 1.732 times lower for the same kVA, three phase motors are smaller and start better, and the load can be spread across three conductors. Sets in the 100 kVA class and above are three phase, four wire.

What does 400/230 V mean?

It is one supply written two ways. 400 V is the voltage between any two of the three phase conductors, and 230 V is the voltage between one phase conductor and the neutral. The ratio between them is fixed at 1.732, the square root of three, so 415/240 V, 480/277 V and 208/120 V are the same relationship at other voltages. A set without a neutral has only the line to line figure and cannot feed single phase loads.

Can the voltage of a generator be changed after delivery?

Only within the range the alternator was built for. A twelve lead alternator can be reconnected in the terminal box to a different voltage, and a machine with a voltage selector switch gives two or three settings that can be changed on site. Both are factory or authorised service tasks: the links carry the full machine current, the nameplate has to be reissued, the protection settings have to be re-set and the tests repeated. It is not a field trim, and a set trimmed far from its nameplate without that work is a commissioning problem waiting to happen.

Send the voltage, the phase and the load

Tell us the supply voltage at the destination, whether the site is three phase four wire, and the load list in kW. We will confirm the voltage and the phase the set should be built at, and come back with the current per phase, the cable and switchgear the installation needs, and the alternator options for the range.

Request a quote WhatsApp the sales desk

Written and maintained by the KVA Grid sales engineering desk. The voltage pairs and market figures used on this page are the planning figures published elsewhere on this site: 400/230 V as the default 50 Hz supply for the Gulf, Africa and Asia, 415/240 V for specifications written to legacy British standards, 380/220 V for older European and legacy export projects, and 480/277 V, 208/120 V, 600/347 V and 440/254 V for 60 Hz destinations, all at a fixed ratio of 1.732 between the line voltage and the phase voltage. Currents per phase are calculated as kVA multiplied by 1000 and divided by 1.732 times the voltage, rounded to 0.1 A, and they are planning figures rather than a cable schedule. This page explains how a supply is specified and is not a quotation or advice on any specific project. Reviewed 7 October 2026.