Neutral Earthing Resistors and Restricted Earth-Fault Protection on MV Standby Sets


A medium-voltage standby generator is not an LV set with a larger alternator. At 6.6 kV or 11 kV the neutral is usually earthed through an impedance, and the earth-fault current is deliberately kept small. That choice limits damage to the stator core, but it also removes the fault current that a simple overcurrent relay would use. Restricted earth-fault protection makes the winding zone sensitive again. The resistor and the relay are therefore one design problem, not two purchased items.

The MV neutral is a design decision, not a cable size

On a low-voltage generator the neutral is often solidly earthed. The earth-fault current is high, the protective device sees it easily, and the cable and bonding are sized for the resulting thermal and touch-voltage duty. At medium voltage the same solid connection can produce a fault current large enough to damage the stator core before the breaker clears it. The core is laminated steel; once the fault arc burns through the laminations, the repair is no longer a winding job.

An impedance-earthed neutral changes that outcome. A neutral earthing resistor, or NER, is connected between the generator neutral and the earth grid. During a phase-to-earth fault the resistor limits the current that returns through the neutral. The generator is still earthed, the fault is still detected, and the energy released at the fault is reduced. The price is that the fault current may be only a small multiple of the load current, or less.

Neutral earthing methods and what each one asks of the protection. The current values are design outputs, not universal constants.
Method Earth-fault current Insulation and damage Protection consequence
Solid earthing Highest, set by the source and the fault loop High energy at the fault; stator core damage can be severe Overcurrent and earth-fault elements operate easily; touch voltage needs careful design
Unearthed neutral Very small, mostly capacitive Transient overvoltages can stress the winding insulation Detection is difficult; insulation monitoring and surge protection become central
Low-resistance NER Limited to a designed value, commonly a few hundred amperes Fault damage is reduced; neutral displacement must be checked REF or a sensitive earth-fault element is needed to see faults near the neutral
High-resistance NER Smaller still, often below the load current Very low fault energy; insulation coordination is critical Very sensitive detection; clearing may be delayed or alarm-only by design

What the neutral earthing resistor actually does

For a phase-to-earth fault at the generator terminals, the current through the NER is approximately the phase-to-neutral voltage divided by the resistance plus the source and fault-path impedance. The approximation is useful for a first pass, not for the rating. During the first cycles the generator’s subtransient reactance and the fault-point resistance change the current, and the resistor has to survive the resulting thermal pulse.

The resistor is a short-time device on most standby sets. Its nameplate carries a current and a duration, and the two belong together. A resistor rated for a short fault duty may be damaged by a protection scheme that takes longer to clear, or by a re-strike that adds a second pulse before the first has cooled. The relay clearing time, the breaker opening time and the resistor thermal curve have to be compared as one sequence. If the scheme is continuous-rated because of a different earthing philosophy, that is a different product with a different thermal basis.

The site ambient matters here as much as it does for the generator. A resistor enclosure in a plant room or an outdoor yard sees the same hot, humid air as the set. At the 40 °C reference ambient used elsewhere on this site, the temperature rise available to the element is already reduced; above that reference, the manufacturer’s derating data governs. Salt-laden air adds a second problem: polluted insulators and terminals can track before the element itself reaches its limit.

The schedule of a neutral earthing resistor. Each row changes the fault current, the thermal duty or the ability to test the REF zone.
Input Why it matters Where the figure comes from
System voltage and generator neutral insulation Sets the voltage across the resistor during an earth fault Generator data and single-line diagram
Target earth-fault current Sets the resistance and the damage limit at the stator Generator maker’s data and project specification
Fault duration Sets the thermal duty, which is current squared multiplied by time Protection clearing time and breaker time
Resistance tolerance Changes the current at a given voltage and the REF setting margin Resistor datasheet
Short-time or continuous rating Prevents the element from being asked to carry a duty it was not built for Resistor datasheet and earthing philosophy
Temperature rise at site ambient Hot climate, enclosure and ventilation decide the real margin Manufacturer data at 40 °C and above
Neutral CT position Defines the REF zone and the place where the circuit can be tested Single-line diagram and protection scheme

Restricted earth-fault protection is a zone, not a relay setting

Restricted earth-fault protection compares the current entering the protected winding with the current leaving it through the neutral. The phase current transformers at the generator terminals define the top of the zone. The neutral current transformer, in the generator neutral earthing path, defines the bottom. The relay sums the phase currents and subtracts the neutral current. In a healthy generator, or for a fault outside the zone, the sum is ideally zero. For a phase-to-earth fault inside the stator winding, some current returns through the neutral and the difference operates the element.

The word restricted is the important one. REF is not a general earth-fault relay looking at the whole installation. It is deliberately blind to faults beyond its CTs, which is what allows it to be set sensitively without tripping for a feeder fault. That sensitivity is exactly what an impedance-earthed generator needs, because a fault near the neutral end of the winding may produce a current too small for the generator overcurrent element to see.

The neutral CT must be the only path between the generator neutral and the earthing system at that point. A parallel bond, a temporary test link left closed, or a second earth connection around the CT gives the neutral current a route that the relay cannot measure. The result is a protection zone that looks complete on the drawing and is blind in service. The same discipline applies to the phase CTs: their ratio, class, polarity and secondary wiring must match the relay’s expectation, and the neutral CT must be consistent with them.

Setting the element is a balance. It must be above the spill current produced by CT errors, phase imbalance and through-faults, and below the smallest internal fault current the zone is expected to clear. On a solidly earthed machine that window is wide. On an NER-earthed machine the lower edge can be very low, and the CT class, lead burden and relay minimum setting decide whether the window still exists. A high-impedance REF scheme uses a stabilizing resistor and a voltage element; a numerical scheme may use a biased differential element. Either way, the zone and the CT performance come first.

What the REF zone sees for different fault locations. The relay is expected to restrain for everything outside the generator winding zone.
Fault location Current in the phase CTs Current in the neutral CT Expected REF response
Phase-to-earth at the terminals Fault current in one phase Return current through the NER Operate, subject to the NER thermal duty
Phase-to-earth near the neutral end Small current, possibly below load current Small return current through the NER Operate only if the CT and relay are sensitive enough
Earth fault on a feeder Through-fault current No generator neutral return for that fault Restrain; check spill current and CT mismatch
Earth fault while paralleled with the grid Grid contribution may flow through the generator Possible circulating zero-sequence current Restrain for external faults; prove the neutral path
Open neutral CT secondary Normal load or fault current No usable neutral signal Do not rely on the element; test the circuit and provide supervision

Sizing the resistor and the relay as one problem

The starting point is the maximum earth-fault current the generator maker will allow at the stator, not the relay’s most convenient setting. That current, together with the permitted clearing time, sets the resistor’s resistance and thermal rating. The protection engineer then checks whether the available CTs and relay can detect the smallest fault the zone must clear. If they cannot, the answer is not to raise the fault current without the maker’s approval; it is to change the CT scheme, the relay, or the earthing design.

A useful check is a set of fault cases, not a single number. The terminal fault proves the maximum duty. The neutral-end fault proves the sensitivity. An external fault proves stability. Parallel operation proves that the zero-sequence path is still the one drawn on the single-line diagram. Each case has a different current path and a different reason to fail.

Design cases that should be checked before the NER and REF settings are frozen. Each case proves a different part of the scheme.
Case Current path REF expected What to check
Terminal phase-to-earth fault Stator winding to the NER and earth Trip NER thermal duty, CT saturation and breaker clearing time
Neutral-end phase-to-earth fault A small part of the winding to the NER Trip Relay minimum setting and neutral CT sensitivity
External feeder earth fault Fault current returns through the system earthing No trip CT ratio, polarity and spill current
Parallel operation with the grid More than one neutral and earth path No trip for an external fault Neutral switching, interlock and circulating zero-sequence current
Islanded operation Generator neutral is the only source neutral Trip NER in service and neutral CT in circuit
Intermittent or restriking fault Repeated current pulses through the NER Trip Resistor duty, trip circuit and reclose policy

Parallel operation changes the zero-sequence circuit

A single islanded generator has one neutral path, and the REF zone is easy to see. Two generators, or a generator paralleled with the grid, change that. If both neutrals are solidly earthed, an earth fault has more than one return path, and the current split depends on the impedances of the paths rather than on the drawings. If one neutral is switched, the breaker close logic has to know which neutral is in service before the machine is connected.

Circulating zero-sequence current is the symptom to watch. It can flow between neutral points even when no fault exists, heating a resistor that was assumed to be idle and producing spill current in a REF element. The design should show the neutral path for every operating mode: single set islanded, two sets islanded, generator paralleled with the grid, generator on a load bank, and maintenance with the NER isolated. A synch-check relay proves voltage, frequency and phase angle; it does not prove that the neutral is in the right state.

Neutral path and REF status by operating mode. The table is a prompt for the single-line diagram, not a substitute for it.
Operating mode Neutral path REF status Verification
Single set islanded Generator neutral through its NER In service Primary injection through the neutral CT
Two sets islanded Each set’s neutral through its own NER, or a documented common arrangement Each zone independent Circulating current and spill current check
Generator paralleled with the grid Grid neutral and generator neutral both present or one switched Must restrain for grid through-faults Neutral switch and close interlock test
Generator on a load bank Generator neutral through its NER In service Load test plus a separate REF test
Maintenance, NER isolated Neutral disconnected or test link open Out of service under permit Lockout, labelling and restoration check

Commissioning and annual proof

Commissioning has to prove the whole zone, not just the relay. A secondary injection proves the relay operates at its setting. It does not prove the CT ratio, the polarity, the neutral CT position or the wiring between them. A primary injection through the generator neutral, with the current returned through the phase CTs, proves the complete path. The test should be recorded with the injected current, the measured relay current, the operating time and the trip target.

The NER itself needs a measurement, not a visual check. A DC resistance measurement across the element and its connections confirms the resistance and reveals a loose terminal or a corroded joint. An insulation resistance test confirms that the element is not shorted to its enclosure. The enclosure, ventilation openings and cable terminations should be inspected for corrosion and tracking, especially on a coastal site. The neutral CT secondary circuit should be tested for continuity and insulation, and the test link should be returned to its service position and recorded.

The annual load test is a separate proof. This site’s maintenance basis is a load test once a year at 50 % to 100 % of rating, with the 10 % to 20 % band treated as a low-load condition rather than a normal operating point. That test proves the engine, the alternator, the cooling system and the fuel system. It does not prove the REF element, and a successful load test should never be used as the annual protection test.

Fuel planning for the same set follows the published figures: about 0.24 to 0.29 litres per delivered kWh, with a 500 kVA set at 101 litres an hour at full load, 80 litres an hour at 75 % and 60 litres an hour at 50 %. A 1000 kVA set at about 200 litres an hour needs about 4800 litres for 24 hours. Those numbers set the duration of an island test and the fuel logistics around it; they do not change the NER resistance. On a data-centre site the UPS covers the seconds between mains loss and the generator carrying load, and a PUE of 1.4 means the generator is sized on the total facility load rather than the IT load alone. The MV neutral and REF scheme has to remain correct through those load steps.

Checks that prove the NER, the REF zone and the standby set. Intervals and acceptance values are set by the project specification and the equipment makers.
Check What it proves When it is needed
NER DC resistance The element and its terminals are within the specified tolerance Commissioning, after repair, and at the annual inspection
NER insulation resistance No short circuit to the enclosure or earth Commissioning and after any work on the enclosure
Neutral CT ratio and polarity The REF element sees the neutral current in the correct direction Commissioning and after any CT or wiring change
REF secondary injection The relay operates at its setting and trips the correct breaker Commissioning and the annual protection test
REF primary injection The complete zone, including CTs, wiring and neutral path Commissioning and after a modification to the zone
External fault stability The element restrains for through-faults and CT mismatch Commissioning and after a setting change
Neutral switch and interlock The correct neutral is in service in every operating mode Commissioning and after a change to the close logic
Load test at 50 % to 100 % The engine, alternator and cooling system carry real load Once a year on this site’s maintenance basis
Low-load check at 10 % to 20 % Wet stacking and poor combustion are not being hidden Periodically, as part of the operating record

The mistakes that leave the protection blind

The most common failure is not a failed relay. It is a neutral path that bypasses the neutral CT: a test link left closed, a temporary earth bond not removed, or a second neutral earth added during a modification. The REF element then sees a fraction of the fault current, or none, and the generator trips on a slower backup element or not at all. Every test link and every parallel bond in the neutral path should be labelled, and the restoration should be recorded.

The second common failure is a setting copied from another set. A relay setting that works on a solidly earthed machine can be blind on an NER-earthed one, and a setting that works on one generator reactance can be unstable on another. The third is a scheme tested only in island mode and never in parallel. The fourth is a resistor selected for the fault current but not for the fault duration. The fifth is an annual load test treated as proof of protection. None of these shows up as a defective component; all of them show up as a protection gap.

Does an MV generator need a neutral earthing resistor if the upstream transformer is earthed?

It depends on the system configuration and on whether the generator can operate as a separately derived source. When the generator is paralleled with an earthed grid, the grid may provide the earth-fault path, but the generator still needs a defined neutral arrangement for islanded operation and for its own protection. The single-line diagram should show the neutral path in every mode; the generator maker’s data and the project specification decide the resistance and rating.

What is the difference between REF and generator differential protection?

Generator differential protection compares current at both ends of each phase winding and responds to phase-to-phase and phase-to-earth faults across the whole winding. REF compares the phase currents with the neutral current and is restricted to the stator winding zone. REF is more sensitive to earth faults near the neutral, where the differential element may see too little current. The two schemes overlap deliberately; one does not replace the other.

Can REF work with a high-resistance NER?

It can, but the lower edge of the setting window becomes very small. The neutral CT, its leads and the relay’s minimum setting have to be chosen for that low current, and the scheme has to be stable for through-faults. If the CTs cannot resolve that current, change the CT or relay scheme rather than lowering the setting into spill current.

Why does REF trip on an external fault?

Usually because the phase CTs and the neutral CT do not match, a CT is saturated, the secondary wiring is wrong, or a parallel neutral path is bypassing the neutral CT. An external fault should produce no neutral return through the generator, so the relay should restrain. A trip on an external fault is a commissioning finding, not a normal event, and it should be investigated before the set is returned to service.

How often should the NER and REF be tested?

The interval is set by the project specification and the equipment makers, not by a single universal rule. A common basis is a thorough commissioning test, a repeat after any modification to the neutral path or CT circuit, and an annual protection test alongside the annual load test. The annual load test at 50 % to 100 % proves the machine, not the REF element, so the two tests should be recorded separately.

What records should be handed over?

The single-line diagram with the neutral path marked for each mode, the NER datasheet and measured resistance, the neutral and phase CT data, the REF settings and their basis, the primary and secondary injection results, the trip matrix, and the load-test record. The handover should also state which tests were done in island mode and which were done in parallel, because a scheme proved in only one mode is only half proved.

Send the single-line diagram and the generator data

Tell us the generator rating, the system voltage, the neutral arrangement and the operating modes. The reply sets out the NER duty, the REF zone and the tests that have to be proved at commissioning, in writing.

Request a quote WhatsApp the sales desk

Written and maintained by the KVA Grid sales engineering desk. The figures on this page are the ones published elsewhere on this site: neutral bonding from generator earthing and the neutral; earth-fault loop verification from generator earth electrodes; the annual load test at 50 % to 100 % and the 10 % to 20 % low-load band from the maintenance schedule; the fuel figures of about 0.24 to 0.29 litres per delivered kWh, and 101, 80 and 60 litres an hour for a 500 kVA set at full, 75 % and 50 % load, from fuel consumption; the 1000 kVA example at about 200 litres an hour and about 4800 litres for 24 hours, the UPS bridge between mains loss and generator load, and the PUE 1.4 basis from data center backup power; the transfer timing from generator and UPS interaction; and the 40 °C reference from hot and humid climates. NER current, thermal duty, CT class, REF settings and tolerances are set by the generator manufacturer’s data, the protective device data and the project specification. Reviewed 5 November 2026.