A generator is a weak source. Its alternator impedance is high, its AVR regulates the fundamental voltage rather than the waveform, and every harmonic current from a rectifier or drive produces a voltage distortion that other loads also see. Harmonic mitigation is therefore a source-and-load study, not a filter purchase. This page covers what the harmonics do, how passive and active filters differ, how to derate the set, and where the filter belongs.
The generator is a weak source, not a clean bus
On a utility supply, harmonic currents flow into a low-impedance network, so the voltage at the point of connection stays close to a sine wave. On a generator, the source impedance is dominated by the alternator. The harmonic voltage is the harmonic current multiplied by the impedance at that order, and the reactance rises with frequency. A load that behaves on mains can produce a flat-topped or notched voltage on a set.
The AVR does not remove that distortion. It changes excitation to hold the fundamental voltage, and it has a finite response speed. A distorted terminal voltage can send a UPS back to battery, trip a drive on DC-bus ripple, chatter a contactor or confuse a controller before the generator reaches any thermal limit.
The numbers that matter are the load’s harmonic spectrum and the source impedance at those frequencies. Nameplate kVA contains neither. Two 500 kVA sets with different windings, pitch and subtransient reactance can behave differently on the same drive load, which is why a filter chosen from a catalogue without a measurement at the terminals is a guess.
Harmonic current also lowers true power factor, which is displacement power factor multiplied by distortion power factor; the alternator heats on rms current.
| Path or component | What the harmonic current does | Design consequence |
|---|---|---|
| Alternator stator and rotor | Adds rms current and harmonic heating; negative-sequence content can heat the rotor | Check the alternator maker’s harmonic current withstand, not only the kVA rating |
| Cables and neutral | Raises copper losses through skin and proximity effect; triplen harmonics add in the neutral | Check cable derating and size the neutral for harmonic current, not only the fundamental |
| Distribution transformer | Increases eddy-current and stray losses; can overheat a transformer that is lightly loaded by kW | Use the transformer maker’s harmonic factor or derating data, or a harmonic-duty transformer |
| Capacitors and passive filters | Carry harmonic current and can form a resonant circuit with the source | Check the frequency scan at both utility and generator source impedance |
| Protection and controls | Distorts current waveforms and can move a relay or trip threshold | Coordinate settings with the measured spectrum and the filter switching arrangement |
Measure the spectrum before choosing a filter
Start with a power quality record at the generator terminals and at the bus that supplies the nonlinear loads. The terminals show what the alternator is being asked to supply. The load bus shows which loads produce the distortion and whether a filter there would see the whole current it is meant to compensate.
Record voltage and current waveforms, the harmonic spectrum, neutral current, true power factor and the source configuration. Cover a normal period and the worst realistic load, including the transfer from utility to generator and the largest step load the site can apply. A short snapshot at light load can miss the condition that trips the site.
Record the rectifier type as well. An unfiltered six-pulse rectifier commonly draws 25% to 35% current THD; an input filter brings that to roughly 5% to 10%; a twelve-pulse rectifier lands around 10% to 15%; an active front end can hold it below 5%. These are planning ranges used elsewhere on this site, not a substitute for the equipment datasheet.
Measure both source configurations. A passive filter that is stable on the utility supply may sit near a resonance when the generator is the source, because generator impedance is higher and changes with load. Check the design against both source impedances, not one short-circuit figure copied from a spreadsheet.
| Measurement | Where to take it | Why it changes the design |
|---|---|---|
| Voltage and current waveform plus spectrum | Generator terminals and main LV bus | Shows the distortion the alternator produces and the harmonic current it must supply |
| Current spectrum at each large nonlinear load | Drive, UPS input or rectifier feeder | Decides whether mitigation belongs at the load or at a central bus |
| Neutral current | Main neutral and single-phase load groups | Reveals triplen harmonics and whether the neutral is already overloaded |
| True power factor, kW and kVA | Generator output and main incoming | Separates displacement power factor from distortion power factor |
| Source configuration and transfer sequence | ATS or AMF, generator and utility | Shows which source the filter sees and where it is connected during transfer |
| Ambient at the set and the filter | Generator room and filter enclosure | Sets the derating and cooling check, with 40 °C as the site reference ambient |
Passive filters: tuned, detuned and the light-load trap
A passive shunt filter is a capacitor and reactor in series, tuned near the harmonic order it should absorb. At that frequency the branch has low impedance, so much of the harmonic current flows into the filter instead of the source. A tuned branch is efficient and robust for a stable load with one dominant order, such as a fixed group of six-pulse drives.
A detuned reactor is different. It prevents the capacitor bank from forming a dangerous resonance with the source and absorbs some harmonic current, but it does not remove one order as sharply as a tuned branch. The choice between tuned and detuned, and the tuning point, belongs to the filter manufacturer and the measured spectrum. A filter tuned to the wrong order can raise distortion at another order or overload the capacitor.
The light-load trap is leading power factor. A capacitor bank supplies reactive power whether the load needs it or not. At low load the current can go leading, and an AVR on a lightly loaded set may lose voltage control. The switching scheme has to keep the bank out of service when the load cannot absorb its reactive output.
Resonance is the other trap. The filter capacitor, generator reactance and transformer impedance form a network with more than one natural frequency. A frequency scan at both source configurations shows whether a parallel resonance sits near the 5th, 7th or another order produced by the load. Existing power factor correction capacitors belong in that scan; two banks that look harmless separately can create a resonance together.
| Option | What it does | Best fit | What to watch |
|---|---|---|---|
| Tuned shunt branch | Low impedance at one harmonic order; absorbs most of that current | Stable load with one dominant order, such as a fixed group of six-pulse drives | Detuning from temperature and capacitor aging; resonance with other banks |
| Detuned reactor and capacitor | Moves resonance below the lowest harmonic and carries some harmonic current | Power factor correction on a bus with moderate distortion | It is not a complete harmonic filter; check the residual distortion |
| Line reactor or DC-link choke | Reduces the harmonic current generated by a drive or rectifier | New drives where the reactor can be specified with the unit | Voltage drop and drive compatibility; it does not compensate other loads |
| Phase-shifting or twelve-pulse rectifier | Cancels selected orders between two rectifier bridges | Large UPS or process rectifier with a stable load | Needs a suitable transformer; residual orders still need checking |
| Active front end | Draws a near-sinusoidal current with low distortion | New UPS or drive where low input distortion is a design requirement | High-frequency switching, EMI and generator interaction still need review |
Active filters and low-distortion front ends
A shunt active filter measures load current and injects a compensating current. It can follow several orders and adapt when drives switch in and out. Its rating is not a single kVA number: it has to carry the rms and peak current it injects, so the manufacturer’s rating must be checked against the measured spectrum. CT location and polarity decide what it sees; a filter on the wrong side of a tie breaker can amplify distortion instead of reducing it.
The best harmonic is the one never generated. A twelve-pulse rectifier, active front end or drive with a suitable DC-link choke reduces harmonic current at the source. The trade is that a low-distortion front end is not clean at every frequency: an active front end switches at high frequency and can produce EMI and high-frequency current that the generator and filter must tolerate. The UPS still bridges the seconds between mains loss and the generator carrying load, but its rectifier remains the load the filter has to manage.
For a UPS, use the maker’s generator requirement rather than a generic rule. The planning multipliers used on this site are 1.5 to 2 times the UPS rating for an unfiltered six-pulse rectifier, 1.25 to 1.5 for a filtered six-pulse unit, 1.2 to 1.35 for a twelve-pulse unit and 1.1 to 1.25 for an active front end. They are first-pass figures; the UPS manufacturer’s data and the project specification govern the equipment that is built.
Derating the generator, transformer and neutral
Harmonic derating is not one percentage for every alternator. The maker publishes a harmonic current withstand or a derating curve for the winding, and that curve is the basis for the check. A set can be inside its kW rating and outside its current limit when the current is distorted. Use the measured spectrum, the true power factor and the ambient, not only nameplate kVA and power factor.
The transformer and cables need the same treatment. Harmonic currents increase winding eddy losses and can overheat a transformer that looks lightly loaded on a kW meter. A harmonic-duty or derated transformer is a design choice, and the factor is not universal. Cables lose more to skin and proximity effect at higher frequencies, while the neutral carries triplen harmonics from single-phase loads. Select the neutral as a full-size conductor where those loads exist, and check cable derating against the actual current.
Temperature compounds the problem. The reference ambient is 40 °C, and any rise above it reduces the set’s capability according to the manufacturer’s data. A filter enclosure adds its own losses to the room cooling load, so the ventilation must remove both engine heat and filter heat at the hottest point of the year. Fuel follows the electrical result: the planning basis is 0.24 to 0.29 litres per delivered kWh, with a 500 kVA set at about 101, 80 and 60 litres an hour at full, 75% and 50% load. A 1000 kVA set at 0.8 power factor uses roughly 200 litres an hour and about 4800 litres in 24 hours. A PUE 1.4 example makes the same point: every kilowatt lost in the power path also becomes heat the cooling system must remove.
| Item | What to check | Where the number comes from |
|---|---|---|
| Alternator | Harmonic current withstand, negative-sequence capability and ambient derating | Alternator manufacturer’s data for the specific winding |
| Transformer | Harmonic loss factor, eddy-current heating and neutral loading | Transformer manufacturer’s data and the project’s harmonic study |
| Cable and neutral | Current derating, voltage drop and neutral ampacity | Cable maker’s data and the measured harmonic spectrum |
| Filter | Rms and peak current, voltage rating, losses and temperature limit | Filter manufacturer’s rating for the actual spectrum |
| True power factor | Displacement power factor multiplied by distortion power factor | Site measurement, not the load nameplate alone |
| Ambient | 40 °C reference and the rise above it | Site design conditions and the set manufacturer’s derating curve |
Where the filter belongs: four placement choices
At the nonlinear load, a filter keeps harmonic current out of the upstream cable, transformer and generator. At the low-voltage bus, one unit covers several loads, but its CTs must see all of them. At the generator terminals, it protects the alternator from every harmonic current downstream, but it must be designed for the source impedance and AVR. At the transformer or utility interface, it addresses the utility limit rather than the islanded generator.
The ATS arrangement decides what the filter sees. A filter on the generator side is disconnected when the site runs on utility, so it cannot create a leading power factor there, but it also does nothing for the utility source. A filter on the load side stays connected to either source and must be stable on both. The resonance and leading current are different in the two configurations, so this is a design decision rather than an installation detail.
Placement also changes the derating result. A filter at the load reduces harmonic current through the generator and upstream cables, so it may remove the need for alternator derating. A filter at the generator terminals reduces alternator heating but leaves downstream cables and transformer carrying the harmonic current. Check selectivity, protection and capacitor discharge as well: a filter branch is another path for fault and harmonic current, and on a paralleled system it must be checked with the load-sharing controls because harmonic current can circulate between sets.
| Location | What it protects | What it does not protect | Design checks |
|---|---|---|---|
| At each large drive, UPS or rectifier | The upstream cable, transformer and generator from that load’s harmonic current | Harmonics from other loads on the same bus | Filter rating, drive compatibility, space and maintenance access |
| At the low-voltage bus section | Several nonlinear loads with one central filter | A load fed from another bus section or upstream of the CTs | CT location and polarity, selectivity, bus fault level |
| At the generator terminals | The alternator from all downstream harmonic current | Downstream cable and transformer harmonic losses | Source impedance, AVR stability, resonance on both sources, filter size |
| At the transformer or utility interface | The utility point of connection and the utility’s power quality limit | The generator when the site is islanded and the filter is disconnected | Import and export modes, protection, contractual limit, metering point |
Commissioning and the annual proof
Start with the objective and the limit: protect the alternator, keep neutral current within rating, meet a utility distortion limit or stop a UPS transferring to battery. Those objectives lead to different filter locations. Measure the baseline at both source configurations, model the source impedance with the filter, check the frequency scan for parallel resonance and confirm stability at light load. Reduce harmonic current at the source where possible; a twelve-pulse rectifier, active front end or line reactor may be more robust than a filter added later. Then complete the alternator, transformer, cable and neutral checks with the manufacturer’s data.
Commissioning has to prove the filter at the worst load, not at no load. Take baseline and post-filter records at the same load points, with the same instruments and source configuration. Use the load bank for repeatable steps, and repeat the record during a transfer from utility to generator and back. Check filter current, voltage distortion at the generator terminals, neutral current, true power factor, and the temperature of the filter and set. A filter that looks good at 50% load can be unstable at 10% to 20%, so the light-load point belongs in the test even though it is not a normal operating point.
The annual load test at 50% to 100% of rating is the occasion to repeat the harmonic measurement and confirm that the filter and set still behave as commissioned. Capacitors age, filters accumulate heat and loads change. Trend voltage distortion, filter current and neutral current against the baseline. Keep the commissioning record, filter settings and load-bank results with the generator maintenance file, and review them whenever a large nonlinear load is added.
Can a passive filter be added to an existing generator without changing the set?
Sometimes, but it is not a plug-in decision. The filter changes the source impedance seen by the alternator and can create resonance or leading power factor at light load. Check the frequency scan at both source impedances, the alternator maker’s harmonic current data, and the AVR behaviour at low load and at the annual load-test points. If the AVR cannot hold voltage with the filter connected, the set may need a different excitation arrangement or filter type.
Is an active filter always better than a passive filter?
No. An active filter follows several orders and adapts to a changing load, which suits drives that switch in and out. A passive branch is simpler and robust for a stable load with one dominant order. The active unit has its own losses, rating limits and high-frequency behaviour, and it can be more complex to maintain. A hybrid arrangement can be the better answer when one order dominates but the rest of the spectrum also needs control.
Does a harmonic filter reduce fuel consumption?
Not directly. The filter consumes energy and adds heat, so it is not a fuel-saving device. It can help indirectly if it avoids alternator derating, a larger set or a long light-load run. The planning figures are 0.24 to 0.29 litres per delivered kWh, with a 500 kVA set at about 101, 80 and 60 litres an hour at full, 75% and 50% load, and a 1000 kVA set at roughly 200 litres an hour and about 4800 litres in 24 hours. Any actual change depends on the load profile and should be calculated for the project.
Where should the harmonic filter be installed?
It depends on the objective. At the load, it keeps harmonic current out of upstream cables, transformer and generator. At the low-voltage bus, it covers several loads if the CTs see all of them. At the generator terminals, it protects the alternator but not downstream losses. At the utility interface, it addresses the utility limit rather than the islanded generator. The ATS arrangement and CT location decide what the filter can see.
How do I know the generator is derated correctly for harmonics?
Use the alternator manufacturer’s harmonic current withstand or derating curve for the specific winding, the measured spectrum, the true power factor and the site ambient. The reference ambient is 40 °C, and any rise above it follows the manufacturer’s data. Do not apply a generic K-factor to an alternator or assume a kW reading proves the set is within its current limit. The transformer, cables and neutral need their own checks from their own maker’s data.
Can harmonics trip a generator that is below its rated kW?
Yes. The kW meter shows fundamental power, while the alternator and protection see the distorted current. A set can be inside its kW rating and outside its current or thermal limit, and a resonant filter or leading power factor can make the AVR unstable before overload appears. The fault record, current waveform and voltage distortion at the trip are the evidence; the fix may be a filter setting, a placement change or a different alternator, not simply a larger breaker.
Send the single-line diagram and the power quality record
Tell us the rectifier and drive types, the transformer and ATS arrangement, the measured spectrum and the site ambient. The reply sets out the filter location, the alternator and transformer derating checks, and the commissioning points that have to be proved, in writing.
Written and maintained by the KVA Grid sales engineering desk. The planning figures on this page are the ones published elsewhere on this site: the annual load test at 50% to 100% of rating and the shortened oil interval for 10% to 20% light-load running from maintenance scheduling; the fuel figures of 0.24 to 0.29 litres per delivered kWh, with 101, 80 and 60 litres an hour for a 500 kVA set at full, 75% and 50% load, from fuel consumption; the UPS bridging the seconds between mains loss and the generator carrying load, the PUE 1.4 example and the 1000 kVA case at roughly 200 litres an hour and about 4800 litres for 24 hours from data center backup power; the 40 °C reference ambient and derating above it from hot and humid climates; the rectifier distortion ranges and generator sizing multipliers from generator and UPS interaction; and the neutral current from triplen harmonics from voltage and phases. Tuning points, harmonic limits, derating factors and filter ratings are planning values only; the equipment manufacturer’s data and the project specification govern the system that is built. Nothing on this page is a quotation for a particular project. Reviewed 3 November 2026.