The exhaust line is the only part of a generator installation that must leave the building with hot gas, and it is often the last system to be detailed. A stack that is too short, too close to an air intake or too lightly supported can undo a good room design: fumes return through the louver, condensate stains the roof, and the silencer carries loads it was never meant to carry.
The exhaust system begins at the turbo outlet
Draw the exhaust as a chain, not as a pipe. The chain starts at the engine outlet, passes through a flexible bellows, the silencer and any after-treatment device, then through fixed and sliding supports, the stack, the penetration and the termination. Each item has a structural role, a thermal role and a pressure role. If one is detailed in isolation, the others pay for it.
The engine manufacturer sets the maximum allowable back pressure at the outlet. That figure is a budget for the whole chain, not a target for the silencer alone. A catalyst or diesel particulate filter can consume most of the budget before the stack is considered, which is why the after-treatment layout and the stack layout have to be designed together. The relationship between restriction, soot loading and engine operation is covered in exhaust after-treatment and back pressure; the stack is the last component in that same calculation.
Thermal growth is the second chain-wide issue. A stainless exhaust line can grow appreciably between cold and operating temperature, and the growth has to go somewhere. Fixed supports carry weight and locate the line; sliding supports allow movement; the bellows absorbs the movement that remains and isolates engine vibration from the building. A bellows that is installed compressed, extended or twisted to correct a misalignment will fail early, and the failure may appear as a crack in the stack rather than at the bellows itself.
Insulation belongs to the same chain. It keeps the gas above its dew point, protects people from contact, reduces radiated heat into the room and lowers the sound radiated by the pipe. The insulation and cladding also add weight, so the support spacing must be checked after the insulation system is chosen, not before.
| Component | Function | Design check | Handover evidence |
|---|---|---|---|
| Engine outlet and manifold | Collects exhaust at the turbocharger outlet | Flange rating, gasket, access for inspection | Joint check and torque record |
| Flexible bellows | Absorbs thermal movement and engine vibration | Installed neutral, correct length, no torsion | Installation photograph and check sheet |
| Silencer | Reduces exhaust noise | Pressure drop at design flow, support, drain point | Pressure-drop curve and support record |
| After-treatment device | Reduces regulated exhaust constituents | Restriction budget, regeneration interface, access | Device record and back-pressure reading |
| Fixed and sliding supports | Carry weight and allow thermal growth | Load path, spacing, sliding clearance, corrosion | Support schedule and inspection record |
| Stack and termination | Discharge gas away from openings and people | Height, separation, rain protection, access | As-built drawing and roof survey |
| Condensate drain | Remove liquid that collects at low points | Fall, pocket, trap, disposal route, access | Drain flow test record |
| Insulation and cladding | Control surface temperature and radiated heat | Thickness, finish, weight, removable sections | Insulation schedule and completion check |
Discharge location decides whether the exhaust comes back
The stack has two jobs outside the building: carry the gas away from people and openings, and keep it out of the building’s own air intakes. Those jobs are linked, because the plume does not rise straight up in every wind condition. On the leeward side of a roof, a stack can sit in a recirculation zone and pull its own discharge back toward the louver. The same happens when a taller adjacent building creates a wake that reaches the termination.
When exhaust returns to the radiator intake, the room loses cooling margin. The 40 °C reference ambient is already a design condition in this climate, and a plume that adds heat to the intake raises the effective temperature above that reference. The result is not only a smell; it is a derating risk and a possible high-temperature alarm. Radiator siting and ambient derating are covered in radiator cooling and ambient derating, but the exhaust termination has to be coordinated with that siting study rather than chosen afterward.
Separation from openings is not a single distance. A window, a door, a louver, a fresh-air intake, a kitchen extract or a neighbouring building’s intake each respond differently to wind and to buoyancy. The height and separation are determined by the manufacturer’s data and the project specification, with the building geometry and prevailing wind included. A stack that is acceptable on a flat roof may be wrong beside a parapet or a plant room, because the parapet changes the flow pattern and can hold the plume at roof level.
Access matters too. A termination that cannot be inspected or cleaned will not stay in the condition it had at handover. If the stack is on a roof, the roof needs a safe route, a working platform and a guard around the penetration. If it discharges at low level, the plume must be kept away from walkways, doors and operable windows, and the outlet must not be blocked by stored material or landscaping.
| Receiver | How exhaust reaches it | Design response | Verification |
|---|---|---|---|
| Radiator intake louver | Recirculation in the roof wake or a short stack | Raise or relocate the termination; separate intake and discharge | Air-path survey with the set running |
| Operable windows and doors | Buoyant plume or wind-driven drift | Increase separation; redirect the outlet away from the facade | As-built survey and walkdown |
| Fresh-air intake | Direct alignment or wake entrainment | Move the intake or the stack; check both wind directions | Intake and plume check at handover |
| Adjacent building intake | Cross-building wake | Coordinate height and direction with the neighbouring geometry | Site survey and project review |
| Roof surface and drainage | Condensate, rain and soot fall-out | Drain to a safe point; protect waterproofing and finishes | Drain flow and roof inspection |
| Maintenance access | Hot surfaces and guarded openings | Platform, guard, clearance and safe route | Walkdown with the maintenance team |
Back pressure is a shared budget
Every component in the chain consumes part of the allowable back pressure. The silencer, the after-treatment device, the elbows, the stack length, the rain cap and the bird screen all take their share, and the engine only sees the total. The limit is set by the manufacturer for the engine and its after-treatment; it is not a universal number that can be applied to another set or another fuel system.
Fittings are often underestimated. Two tight 90-degree elbows can cost more than several metres of straight pipe, while a long-radius bend or a pair of 45-degree bends reduces the loss. A diameter reduction at the stack inlet adds loss and can also create a trap for condensate. Transitions should be gradual and in the direction of flow, and the stack diameter should not be reduced at the termination to make the weather hood fit.
The termination is part of the pressure budget. A rain cap, a bird screen, a weather hood or an acoustic baffle all add restriction, and all of them can become blocked. If the design uses one, both the clean and the dirty pressure drop have to be considered. A screen that is clean at commissioning can be partly blocked after a season of operation, and the engine will feel that change as a loss of margin.
Back pressure also changes with the engine. At full load the gas flow and temperature are highest; at the 10 % to 20 % light-load band the flow is lower and the gas is cooler. The annual load test at 50 % to 100 % of rating is the point to confirm that the installed system stays within the manufacturer’s limit at the top of the operating range, while the light-load check shows whether the stack is staying warm enough to avoid wet operation. The same test is the moment to compare the installed reading with the value recorded at commissioning, because a rising trend is more useful than a single pass or fail.
Do not tune back pressure by removing a silencer, a catalyst or a rain cap without checking the effect on noise, emissions and water entry. The three functions are coupled. A change that makes the pressure gauge look better can make the installation worse in a way that appears months later.
| Contributor | Why it matters | How it changes | Design response |
|---|---|---|---|
| Silencer | Large share of the pressure budget | Flow, soot, internal damage | Select on pressure drop as well as noise |
| Catalyst or DPF | Restriction rises as deposits accumulate | Load history, fuel quality, regeneration | Include the device in the budget from the start |
| Elbows and bends | Each change of direction adds loss | Radius, angle, number of fittings | Long-radius bends; avoid tight pairs |
| Stack length and diameter | Friction and velocity both matter | Height, diameter, internal finish | Size for the full operating range |
| Rain cap or bird screen | Adds restriction and can block | Debris, insect nests, ice, soot | Choose a low-loss type and keep it accessible |
| Soot and deposits | Reduces effective area over time | Light-load running, cold starts, fuel quality | Include cleaning in the maintenance schedule |
| Insulation damage | Changes temperature and condensation | Mechanical damage, water ingress | Inspect cladding and seals at each service |
Condensate, rain and corrosion
Condensate forms whenever the gas cools below its dew point. That can happen during a cold start, at light load, in a long uninsulated run or when rain enters the stack. The liquid is not pure water; it can be acidic, and it will attack carbon steel, stain roof finishes and soak insulation if it is allowed to collect.
The drain belongs at the lowest point of the run, not at the bottom of the stack by habit. It needs a pocket that collects liquid without reducing the gas path, a fall toward the pocket, a trap that prevents gas escape, and a disposal route that does not discharge onto the roof, into the louver or onto a walkway. Where the project requires neutralisation, the treatment device needs access and a replacement schedule. A drain that is installed but never checked is a future leak, so the line needs a removable trap and a visible discharge point.
Rain entry is a separate path. A vertical stack needs a termination that sheds rain without closing the gas path. A horizontal discharge needs a slight fall outward and a screen that does not collect water. A cap that lets water stand in the pipe, or a horizontal run that sags, will deliver water to the silencer and the engine. The stack top should be detailed so that the weather hood, the screen and the drain work together rather than fighting each other.
Material selection follows the condensate risk. Stainless steel or a coated carbon steel system is common where condensate is expected, and the support saddles need isolation to avoid galvanic corrosion. Insulation must be closed at every penetration and removable at inspection points. The 40 °C reference ambient does not remove the condensation mechanism: the stack still cools at night, during start-up and at light load, and those are the conditions in which the drain has to work.
| Termination | Rain protection | Back-pressure cost | Condensate behaviour | Watch |
|---|---|---|---|---|
| Vertical open-ended stack | Low without a hood | Lowest | Rain can enter; drain essential | Screen and drain access |
| Vertical stack with rain cap | Good | Moderate to high | Cap can trap water if poorly detailed | Pressure drop and blockage |
| Vertical stack with weather hood | Good when sized correctly | Moderate | Hood must shed water clear of the outlet | Wind-driven rain and snow |
| Horizontal wall discharge | Depends on fall and screen | Moderate | Water runs back if the fall is wrong | Wall staining and plume path |
| Insulated stack with drain pocket | Depends on termination | Adds weight, not much loss | Keeps gas warmer and collects liquid | Drain trap and insulation seals |
| Stack with acoustic baffle | Depends on hood detail | Higher | Baffle can collect soot and water | Noise versus pressure budget |
Support, penetration and fire stopping
The stack is a structure, not a duct hung from whatever is convenient. It carries its own weight, the weight of the insulation and cladding, the thermal movement of the line, wind load and, where the project requires it, seismic load. The support scheme is determined by the manufacturer’s data and the project specification, and it should be shown on a support drawing rather than left to the installer.
The support steel should come from the building structure, not from roof sheeting or from a cable tray. Fixed supports carry weight and locate the line; sliding supports and guides allow axial movement without letting the stack sway. The penetration should not be used as a restraint. If the stack is clamped rigidly at the roof and also fixed at the engine end, the thermal growth has nowhere to go and the bellows or the flange takes the strain.
The penetration is a weather and fire interface at the same time. It needs a curb, flashing and a waterproofing detail that survives movement, plus the fire-stopping arrangement required by the project specification. Clearance to combustible construction and the treatment of the annular space are determined by the project’s fire design and the manufacturer’s data; they are not interchangeable between buildings. A penetration that is sealed with a rigid material can also lock the stack and create the same restraint problem as a clamp.
Vibration and noise cross the same interface. The bellows at the engine isolates the line from the set, and the stack support should be independent of the roof structure in a way that does not create a rigid flanking path. Acoustic lagging on the stack reduces radiated noise but adds weight and can hide corrosion, so removable sections are useful at inspection points. The acoustic treatment of the room itself is covered in generator room acoustics, but the stack termination and the room louver have to be considered together because both affect the sound at the boundary.
| Interface | Design requirement | Check by | Handover record |
|---|---|---|---|
| Engine connection | Bellows neutral; flange aligned; no pipe load on turbo outlet | Mechanical and commissioning | Alignment and torque check |
| Support steel | Carry weight and movement; fixed and sliding points defined | Structural and mechanical | Support drawing and inspection |
| Roof penetration | Curb, flashing, waterproofing and movement allowance | Building envelope | Water test and as-built detail |
| Fire stopping | Project fire design; compatible with movement and insulation | Fire safety and building | Inspection record |
| Thermal movement | Guide and slide arrangement; expansion path clear | Mechanical | Cold and hot position check |
| Vibration isolation | No rigid bypass through support or penetration | Mechanical and acoustic | Walkdown and measurement |
| Acoustic treatment | Lagging and termination coordinated with noise target | Acoustic and mechanical | Noise check at boundary |
Commissioning proves the chain, and the annual check keeps it
Commissioning is the first time the whole chain runs together, so it is the right time to prove it. Confirm the back pressure at full load, check that the bellows is free and neutral, verify the sliding supports move in the expected direction as the line heats, pour water through the drain to prove the trap and the disposal route, and inspect the termination for rain protection and clearance. Check the insulation and cladding, the penetration and the fire stopping, and record every reading against the as-built drawing.
The annual service is the recurring check. The load test at 50 % to 100 % of rating exercises the stack at the top of its range, and the 10 % to 20 % light-load band exercises the condition in which the gas is coolest and condensate is most likely. At the same visit, inspect the supports and bellows, clean the screen or cap, check the drain, look for corrosion at the low point and confirm that the insulation is still closed.
Fuel flow is a useful cross-check because exhaust mass flow follows it. A 500 kVA set at full load burns about 101 L/h, about 80 L/h at 75 % and about 60 L/h at 50 %, while a 1000 kVA set runs at about 200 L/h and about 4800 L over 24 hours at that condition. The site figure of 0.24 to 0.29 L/kWh gives the same picture in another form. A set that spends most of its life at half load is sending a cooler, lower-flow stream up the stack, so the stack may be sized comfortably for full load yet still be wet at the load it actually sees.
Record the readings as a trend, not as a single pass result. A back pressure that has risen since the last visit, a drain that now runs slowly or a support that has moved all point to a change in the chain. The trend is what turns an annual inspection into a maintenance decision rather than a box to tick.
| Item | Method | Acceptance | Record |
|---|---|---|---|
| Back pressure | Measure at the manufacturer’s reference point under load | Within the manufacturer’s limit at full load | Reading, load and ambient temperature |
| Supports and bellows | Visual and manual check; confirm slide direction when hot | No binding, distortion or rigid bypass | Support and bellows check sheet |
| Condensate drain | Pour water through the pocket and trap | Free flow to the disposal point | Drain test record |
| Termination | Inspect cap, hood, screen and clearances | Clear, secure and rain-resistant | Roof walkdown record |
| Insulation and cladding | Check seals, removable sections and surface condition | Continuous and dry | Completion and repair record |
| Penetration and fire stopping | Inspect curb, flashing, seal and fire-stop condition | Intact and compatible with movement | Inspection record |
| Corrosion and leaks | Inspect low point, joints and support saddles | No staining, soft metal or gas leak | Defect list and close-out |
How high should a generator exhaust stack be?
There is no single height that suits every building. The height depends on the roof geometry, nearby structures, prevailing wind, the position of air intakes and operable windows, and the manufacturer’s data for the set. Set the height and separation from a plume study and the project specification, then check them again with the set running.
Can the exhaust discharge horizontally through a wall?
It can, provided the plume is directed away from openings and walkways, the termination sheds rain, the horizontal run falls outward and the pressure budget still works. A horizontal discharge is more exposed to wind-driven rain and wall staining, and it is easier to block, so the termination needs a screen and a maintenance route.
Why does water come out of the exhaust?
Water is usually condensate formed when the exhaust gas cools below its dew point, especially during start-up, at light load or in an uninsulated run. It can also be rain entering the termination. The liquid can be acidic, so it should be collected at a low-point drain and taken to a safe disposal point rather than allowed to soak the roof or the insulation.
Does a rain cap increase back pressure?
Yes. A rain cap, weather hood, bird screen or acoustic baffle all add restriction, and the effect grows as the device becomes blocked with soot, debris or insects. Include both the clean and the dirty pressure drop in the exhaust budget, choose a low-loss termination and keep it accessible for cleaning.
Can the stack be supported from the roof sheeting?
No. The stack should be supported from the building structure with a support scheme designed for its weight, thermal movement, wind and any project seismic requirement. Roof sheeting is not a structural support, and a rigid connection at the penetration can prevent the thermal movement that the bellows is meant to absorb.
How often should the exhaust system be inspected?
Inspect it at commissioning and at every annual service, alongside the load test at 50 % to 100 % of rating and the 10 % to 20 % light-load check. Inspect sooner after an abnormal event, a long light-load period, visible staining or a change in back pressure. The inspection interval and acceptance values are determined by the manufacturer’s data and the project specification.
Review the exhaust route before the set is ordered
Send the set rating, room drawing, roof geometry and proposed termination. The review will set out the pressure budget, support and penetration interfaces, condensate route and the points to verify at handover.
KVA Grid sales engineering desk. Reused site figures: the annual load test at 50 % to 100 % of rating and the 10 % to 20 % light-load band from the maintenance schedule; 500 kVA at 101/80/60 L/h, 1000 kVA about 200 L/h and about 4800 L over 24 hours, and 0.24 to 0.29 L/kWh from fuel consumption; 40 °C ambient from hot and humid climates; airflow from generator room ventilation; exhaust restriction and support from exhaust after-treatment; service routes from generator room layout; handover records from the commissioning checklist; radiated noise interfaces from room acoustics. Stack height, separation distances, back-pressure limits, structural loads, penetration details, insulation and inspection intervals are determined by the manufacturer’s data and the project specification. Reviewed 8 November 2026.
