A standby generator can sit idle for weeks and still be expected to start on the first crank. The battery charger is the only equipment on site that works through that entire idle period, yet it is usually judged by a green lamp and a log entry. A charger that has lost its settings, a sense lead that has opened, or a boost timer that never dropped out will not stop the set today. It quietly changes the battery’s condition until the one start that matters, which is why the charger deserves the same commissioning evidence as the engine.
The charger is a permanent load, not an accessory
The charger has two jobs, and sites often size it for only one. The first is to hold the battery at full charge against self-discharge. The second is to carry the continuous DC load that remains connected while the set is stopped: the controller’s memory and display, protection relays, the annunciator, sensors, and increasingly a telematics gateway. A charger selected from battery capacity alone may recover the battery after a start but sit at current limit while the controls draw their share.
A charger cannot repair a tired battery; it can bring a healthy one back to float and keep it there. It cannot restore capacity lost to sulfation, dry-out or a shorted cell, and it cannot compensate for a battery that is too small for the starting duty. The cold-start article in this series treats the battery as an energy chain; the charger is the part of that chain that refills it.
Failure is usually silent. The battery has enough reserve to carry the controls and crank the set once or twice, so a charger that has been off for a week may produce no symptom until the reserve is gone. The annual load test at 50% to 100% of rating proves the generator and its fuel system, not the charger; a set can pass the test and still fail to start a month later. The charger needs its own check, and the check needs a record that shows the actual voltage and current rather than the lamp colour.
| Load | What it needs while the set is stopped | If the charger cannot carry it |
|---|---|---|
| Controller and display | Memory, clock, communications and screen backlight | Event history is lost and the controller may reset |
| Protection and monitoring relays | Status, trip circuits and metering | Relays may drop out before the battery is empty |
| Annunciator and alarm panel | Lamps, horn and remote contacts | Alarms may be lost exactly when they are needed |
| Telematics gateway | Cellular router and I/O module | Remote monitoring goes offline without a local alarm |
| Sensors and transducers | Fuel level, temperature and pressure signals | Readings drift or freeze at the last value |
| Charger control board | Setting memory and display | Settings may revert to factory defaults after a long outage |
To see the charger as a load, add up the DC current that remains connected with the set stopped and compare it with the charger’s rated output at site ambient. The difference is what is left for recharging. At the 40 °C reference used for this series, a charger mounted in a hot room may not deliver its nameplate current, and the margin disappears before anyone notices.
Float, equalize and boost are not interchangeable
Float is the long-term state. The charger holds a voltage that keeps the battery full without driving significant current through it, and the small current that remains offsets self-discharge and the continuous DC load. Float is the normal condition of a standby battery for almost all of its life.
Equalize is different. It applies a higher voltage for a limited time so that cells in a flooded battery reach the same state of charge and the electrolyte is mixed. Some manuals use boost for the recharge stage after a discharge, others for equalize; the panel label is not a definition. Read the manual and battery data together, and decide which behaviour the site needs. A recharge boost that ends on current is not the same as a maintenance equalize that ends on a timer.
Equalize is not a routine cure. On a flooded battery it may be justified by a widening cell voltage spread, a specific gravity check, a long recharge time or the maker’s schedule. On a valve-regulated battery it can dry the electrolyte and start a thermal event, so it is permitted only where the battery maker explicitly allows it. The charger should require a deliberate action, display that equalize is active, and drop back to float when the timer expires. A manual equalize that depends on someone remembering to switch it off is a defect waiting to happen.
Ventilation belongs in the same paragraph. A battery at equalize voltage produces more gas than one at float, and the battery room or enclosure must be able to clear it. The ventilation article in this series covers room air and enclosure airflow; the charger setting and the ventilation design have to be checked together, not separately.
| Mode | Purpose | How it should end | Main risk if misused |
|---|---|---|---|
| Float | Hold full charge and carry the DC load | Continuous while temperature is within limits | Dry-out or undercharge if the setpoint is wrong |
| Recharge boost | Restore energy after a start or discharge | Current or time limit set by the battery maker | Overheating if the current limit is too high |
| Equalize | Bring flooded cells to a common state | Timer, temperature and gas limits | Dry-out, gassing and thermal runaway |
| Manual test | Prove the charger can reach each stage | Supervised, then returned to float | Battery left on boost for days |
Turn the battery data sheet into locked charger settings
The battery data sheet is the source of every setpoint. It gives the float and equalize voltage per cell at a stated reference temperature, the temperature compensation slope, the maximum recharge current, the ripple limit, the recharge time and the alarm thresholds. The charger must be capable of those values, adjustable to them, then locked so a casual reset does not return it to factory defaults.
Temperature compensation is the setting most often left at the factory value. A sensor on the charger terminal block reads the cabinet, not the battery, so a battery in a warm room is undercharged or overcharged for most of the year. Put the sensor on a representative cell or block, follow the maker’s placement instruction, and record the slope. If the sensor is disconnected, the charger should fail to a safe state and alarm, not assume a comfortable temperature.
Remote sense is the other correction that is easy to omit. The charger regulates at its own terminals; the battery is at the end of a cable that has resistance. At float the drop is small, but during recharge it can leave the battery below the intended voltage while the display looks correct. Sense leads belong at the battery terminals, protected by a fuse, and their failure should be alarmed rather than silently shifting the regulation point.
Ripple is a charger specification that rarely appears in a site checklist. A rectifier that is not filtered well enough puts alternating current into the battery, which heats it and can disturb voltage readings. The battery maker states a limit; the charger must meet it at the actual load, not only at no load. If the site has no ripple instrument, the commissioning record should state that the maker’s limit was checked against the charger data.
| Battery data | Charger setting | Evidence at commissioning |
|---|---|---|
| Float voltage per cell | Float setpoint at the reference temperature | Measurement at the battery terminals after stabilization |
| Equalize voltage and duration | Equalize setpoint and timer | Mode indication and automatic return to float |
| Temperature compensation | Slope and sensor location | Charger reading compared with a reference thermometer |
| Maximum recharge current | Current limit | Clamp reading during recharge |
| Output ripple | Filter specification | Maker’s limit checked against the charger data |
| Alarm thresholds | DC low, DC high and charger fail | Each alarm injected and the remote signal confirmed |
| Remote sense | Sense lead point and fuse | Lead opened and the alarm and safe fallback confirmed |
Size the charger around the DC load profile
Charger sizing starts with a load ledger, not with the battery ampere-hour rating. List every DC load that is connected while the set is stopped, separate continuous from intermittent, and add the current the battery maker permits for recharge. The charger must supply the continuous load and the recharge current at the same time; if it cannot, the battery will never reach float while the controls are connected.
The recharge current is a battery limit, not a charger ambition. A current that is too high heats the battery, shortens life and can warp plates; a current that is too low leaves the battery partially charged for too long. The maker expresses the limit as a fraction of capacity and a recharge time, and those two figures set the charger rating together with the continuous load. Faster is not better unless the battery data says so.
Redundancy is a project decision. Some sites use two chargers with load sharing so that one can be maintained while the battery stays charged; others accept a single charger with a monitored alarm and a spare module. Parallel chargers need a defined sharing scheme and a way to isolate one without back-feeding it. Two chargers connected to one battery without that design can fight each other, inflate the alarm count and hide a failed unit.
The charger’s AC supply deserves the same thought. It should be a dedicated, labelled circuit, and the design should state whether it is on the normal board, the generator-backed board or a UPS output. The UPS article in this series covers the seconds between a mains interruption and the set carrying load; a charger on the wrong board may be off during exactly that window, and the battery must then carry the controls alone. None of these choices is universal; each is set by the project’s redundancy and ride-through requirements.
| Input | What it represents | Source |
|---|---|---|
| Continuous DC load | Sum of loads connected while the set is stopped | Project DC schedule |
| Intermittent DC load | Largest coincident step, such as a trip or beacon | Project DC schedule |
| Battery capacity | Ampere-hour rating at the stated discharge rate | Battery data sheet |
| Depth of discharge after a start | Energy removed by the crank and the controls | Cold-start calculation and site record |
| Recharge current | Maker’s maximum and recommended value | Battery data sheet |
| Recharge window | Time allowed before the next expected start | Project operating requirement |
| Ambient derating | Charger output at the room temperature | Charger data at the 40 °C reference |
| Cable voltage drop | Drop between charger and battery | Cable calculation and site measurement |
Failure modes that survive a visual inspection
A charger can look healthy and do nothing. The green lamp usually means AC is present, not that current is flowing. A blown DC fuse, an open sense lead, a contactor that has welded closed, a fan that has stopped or a control board that has reverted to defaults can all leave the lamp on. The first check is therefore the current, measured with a clamp or read from a trusted shunt, not the indicator.
Alarms should separate charger failure from battery voltage. A DC low alarm tells you the battery is already being drained; a charger fail alarm tells you why, before the reserve is gone. Good schemes also include AC fail, DC high, earth fault, charger over-temperature and, where the charger has a fan, airflow failure. Each alarm should reach the panel and the remote monitoring system, and each should be identifiable without opening the cubicle.
Testing the alarms by pulling the battery fuse is a bad habit. It creates a real DC outage, can drop protection relays and may leave the site in a worse state than the fault being simulated. Use the charger’s test function or inject the signal at the sensor, and record which alarm appeared locally and remotely. A charger that alarms only at the panel is only half monitored.
Some failures are chemical rather than electrical. A battery that is warm to the touch, smells of acid or shows a rising float current may be in thermal runaway; a battery that never reaches float may be sulfated or have a shorted cell. The charger cannot fix either condition, and continuing to charge can make it worse. The response is to isolate, ventilate and test the battery, not to raise the setpoint.
| Symptom | Likely cause | First check | Do not do |
|---|---|---|---|
| Green lamp on, battery voltage falling | AC present but no DC output | Clamp the DC current and check the DC fuse | Assume the battery is failing |
| Charger current near zero with battery low | Open circuit, open sense lead or failed rectifier | Check the fuse, sense leads and output at the terminals | Bypass the fuse to test |
| Battery warm and gassing at float | Overcharge, wrong setpoint or stuck boost | Check mode, voltage and temperature sensor | Top up a valve-regulated battery |
| DC high alarm | Compensation error or open sense lead | Compare charger and battery voltages | Reset the alarm without finding the cause |
| Repeated charger over-temperature | Fan failure, blocked filter or hot room | Check airflow and ambient at the charger | Raise the alarm threshold |
| Battery never reaches float | Sulfation, shorted cell or undersized charger | Capacity test and load ledger | Increase the voltage indefinitely |
Commissioning and annual verification: measure the charge
Commissioning starts before the charger is energized. Confirm the polarity, the battery fuse rating, the cable torque and the ventilation, then compare every charger setting with the battery data sheet. Record the settings as found and as left. A charger that arrives with a factory float value and a manual listing several battery types is not commissioned until someone proves which type is installed and sets the values.
With the battery connected and the charger in float, measure the voltage at the charger terminals and at the battery terminals, the current into the battery, the battery temperature and the ambient. The two voltages should agree within the cable drop the design allows, and the current should match the connected load plus whatever the battery is taking. If the battery is new or has just been filled, follow the maker’s initial charge instruction rather than assuming float is the first stage.
The AC-fail test is the one that connects the charger to the rest of the site. Remove the charger supply, confirm that the battery carries the controls without a relay dropping out, and measure how long the DC voltage stays above the threshold the equipment needs. Restore the supply and watch the recharge current and the time to return to float. This also confirms the charger is on the board the design intended; one that loses supply with the mains relies on the battery for longer than the load ledger assumed.
Equalize, where permitted, is a supervised test. Confirm ventilation, put a thermometer on the battery, start the mode, watch the temperature and the current, and let the timer return the charger to float. If the charger has no automatic return, the test is not complete until someone has restored float and recorded it. An equalize left running overnight is not a thorough test; it is an overcharge.
Annual verification repeats the measurements and compares them with the commissioning record. Torque checks, alarm injection, ventilation and charger derating belong in the same visit as the annual load test at 50% to 100% of rating. The load test proves the generator can carry load; a separate battery capacity test, at the interval set by the project and the battery maker, proves the battery can still deliver the start. The charger record proves that the battery went back to float afterwards.
| Check | What is measured | When |
|---|---|---|
| Settings audit | Every charger setting against the battery data | Before energizing and annually |
| Polarity, fuse and torque | DC connections and protection | Commissioning and annually |
| Float voltage | Charger and battery terminals | Commissioning, annually and after any adjustment |
| Charge current | Load current plus battery current | Commissioning and annually |
| Temperature compensation | Sensor location and slope | Commissioning and after sensor work |
| AC-fail transfer | Controls stay up on the battery | Commissioning and annually |
| Recharge | Current and time to return to float | After the AC-fail test |
| Equalize, if permitted | Temperature, duration and automatic return | Only when the battery maker allows it |
| Alarms | Local and remote annunciation | Commissioning and annually |
| Ventilation | Airflow and gas clearance | Commissioning and annually |
Can I equalize a sealed VRLA battery?
No, unless the maker permits it for that model. Equalizing a sealed battery can dry the electrolyte and trigger a thermal event; most sealed batteries stay on float with temperature compensation.
What float voltage should I set?
The battery data sheet value for the installed cell type at the stated reference temperature, adjusted by the maker’s compensation slope. No universal number suits flooded, AGM, gel and lithium cells.
Why does the charger still show current when the battery is full?
Because it is carrying the DC load. In float the charger supplies the controller, relays, sensors and gateway, while the battery takes only what it needs to offset self-discharge.
How do I know the charger has failed if the generator still starts?
Check the alarms and DC current, not just the lamp. A battery can mask a failed charger for several starts; a charger fail alarm or falling float current is the evidence.
Can one charger serve two battery banks?
Only with a designed isolation and sharing scheme. Two banks on one charger can cross-charge, confuse current measurement and hide a failed bank.
Does charger verification replace a battery capacity test?
No. Charger verification proves the charging system holds voltage and current within the maker’s limits; a capacity test proves the battery can deliver the energy. The annual load test replaces neither.
Audit the charger before the next start
Send the battery data sheet, charger model, DC load schedule and commissioning records. The review will set out float and equalize settings, recharge current, alarm list and the tests to repeat at the annual load test.
KVA Grid sales engineering desk. Reused site figures: the annual load test at 50 % to 100 % of rating and the 10 % to 20 % light-load band from the maintenance schedule; the 40 °C ambient from hot and humid climates; the UPS seconds between mains loss and set load and the PUE 1.4 base-load example from generator and UPS interaction; the starting energy chain and the difference between a start and a capacity test from cold-start battery autonomy; battery room and enclosure ventilation from generator room ventilation; handover records from the commissioning checklist. Float and equalize voltages, temperature compensation, recharge current, ripple limits, alarm thresholds and test intervals are determined by the manufacturer’s data and the project specification. Reviewed 9 November 2026.