Application
Diesel Generators for Construction Sites
A construction site generator is the only power source on site for months at a time, which makes it a prime power machine rather than a standby one. It runs ten to sixteen hours a day in dust and heat, carries welders and dewatering pumps, and moves to a different corner of the site when the work front changes. The duty rating is the first decision, and it is the one most often got wrong.
Sets for construction are normally quoted between 100 kVA and 300 kVA, most often as canopy or containerised units, and increasingly as trailer mounted sets that follow the work.
Requirements
What a construction site specification has to state
| Item | Typical requirement | Why it changes the set |
|---|---|---|
| Duty rating | Prime power (ISO 8528-1 PRP), not standby | A prime-rated set is a different machine from the standby set of the same kVA, and the fuel curve changes with it |
| Running hours | 10-16 h per day, and often six days a week, for the life of the project | Service intervals are set in hours, so the schedule has to fit the site |
| Load list | Dewatering pumps, tower crane, hoists, welding sets, concrete plant, site offices | The largest motor start and the welder load usually decide the rating |
| Load variation | Load changes hourly as fronts open and close | A lightly loaded set runs inefficiently and can wet-stack; the sizing has to suit the real average, not the peak alone |
| Harmonic loads | Welding sets and inverters draw non-linear current | The alternator may need oversizing for the same kW |
| Dust and heat | Ambient above 45 °C in summer, with airborne sand and cement dust | Filters, radiators and service intervals all change; a canopy keeps the worst off the machine |
| Noise | Site noise limits at the nearest residential boundary, often with different day and night figures | Decides between a standard and an acoustic canopy |
| Mobility | The set moves as the work front moves | Decides between a trailer chassis, a skid and a container |
| Fuel and security | Bunded storage on site, with theft protection and a documented refuelling procedure | Fuel is the largest running cost and the most commonly stolen item on a site |
| Changeover | Direct connection to a site distribution board, or a changeover for a temporary supply alongside a utility connection | Decides the output arrangement and the protection fitted to the set |
Configurations
Configurations we quote most often
| Rating per set | Typical arrangement | Fits | Range page |
|---|---|---|---|
| 100 kVA / 80 kW | One set, canopy or trailer mounted | Villa and small building sites, dewatering and site offices | 100 kVA |
| 200 kVA / 160 kW | One set, plus a second for the later stages | Mid-size projects with a tower crane and hoists | 200 kVA |
| 300 kVA / 240 kW | One set as the site supply, or two in parallel | Multi-block sites, infrastructure and plant-heavy works | 300 kVA |
| 400 kVA / 320 kW and above | Two sets with load sharing | Large infrastructure works and camps with permanent utilities | 400 kVA |
Reference configuration
A worked example
This is an illustrative configuration, not a delivered project. It shows how the requirement table above turns into a specification. Replace the figures with your own load list before pricing.
| Parameter | Example value |
|---|---|
| Dewatering | Two pumps at 22 kW, one running continuously and one on level control |
| Tower crane and hoists | About 45 kW of motor load, started in sequence |
| Welding and small plant | Two welding sets at 12 kVA each plus cutting and compaction equipment |
| Site offices and welfare | About 30 kW of air conditioning, lighting and water heating |
| Realistic average load | About 110 kW, peaking at about 150 kW |
| Rating selected | One set at 200 kVA / 160 kW, prime power rating, in an acoustic canopy |
| Duty | Prime power, 12 h per day, six days a week |
| Fuel | Base tank plus a bunded on-site storage tank refuelled weekly |
| Mobility | Trailer mounted for the first phase, landed on a plinth for the main works |
| Service interval | Shortened from the standard interval because of dust loading, with filter checks weekly |
Questions
Questions we are asked about site sets
Should a site generator be rated prime power or standby?
Prime power, for anything that runs as the main supply. Standby and prime ratings are different declarations of the same hardware: prime power is the continuous rating with a defined overload allowance, and standby is the higher figure that applies to mains-failure duty only. Running continuously at a standby rating is outside the declaration, and it usually shows up as premature engine wear rather than an immediate failure.
Why does the set use more fuel per kWh on a site than expected?
Because a site load varies and the set is often lightly loaded. Efficiency falls away below about 50-60% load, so a set that averages 30% load can use noticeably more fuel per kWh delivered than the datasheet curve suggests. Where the average load is low, a smaller set with a second unit for peak periods is usually cheaper to run than one large machine.
How often does a site set need servicing?
The engine manufacturer’s interval is expressed in running hours, commonly in the 250-500 h band, and on a dusty site it is normal to shorten it and to check the air filter far more often than the schedule says. At 12 h a day, a 500 h interval arrives in about six weeks, so the service has to be planned into the programme rather than booked when the set complains.
Can a site set run with a utility supply as well?
Yes, with a proper changeover arrangement. The common pattern is a temporary utility supply for base load with the generator as the primary source, switched through a changeover device so the two can never be connected together. Where the generator is the only source, it is connected straight to the site distribution board with its own protection, and the earthing arrangement is documented on the panel.
How do you control fuel theft and fuel quality on a site?
Lockable filler caps, a tank that can be locked or isolated, fuel level monitoring with an alarm, and a written refuelling procedure with a log. On quality, the risks are water and dirt rather than the fuel itself, so a bunded tank with a water trap and periodic checks of the filter bowl covers most of it. Biofuel blends need particular attention where a set stands for weeks without running.
Related
Related applications and ranges
-
Diesel generators by application
How the requirement changes between data centres, hospitals, hotels, sites and oil and gas.
-
Trailer mounted sets
Trailer classes, braking rules and site connection.
-
Containerized sets
For camps and long projects where the set stays in one place.
-
200 kVA class
160 kW prime power, a common size for a mid-size site.
-
Silent sets
Where the site boundary is close to housing.
-
Request a quote
Send the equipment list and the working hours, and we size the set on prime power duty.
Powering a site?
Send the equipment list, the daily running hours and the site noise limit. Prime power duty changes the rating, so start there.