500 kVA power class

500 kVA Diesel Generator (400 kW)

A 500 kVA diesel generator delivers 400 kW at a 0.8 power factor. This is one of the most frequently specified commercial ratings: it is large enough to carry a hospital, a hotel tower or a small data hall as a complete bus, and it is still small enough to ship in a standard canopy or a 20 ft container without special transport.

Request a quote Chat on WhatsApp

Ratings

Ratings at a glance

Reference figures for the 500 kVA class at 400/230 V, 50 Hz, 0.8 power factor. The datasheet issued with your quotation governs.
Parameter Value
Prime power (PRP) 500 kVA / 400 kW
Emergency standby (ESP) 550 kVA / 440 kW
Rated voltage and frequency 400/230 V, 50 Hz (380/220 V or 60 Hz on request)
Rated speed 1500 rpm, four-pole (1800 rpm for 60 Hz)
Full-load current 722 A per phase at 400 V
Typical duty Standby for a complete facility bus; prime power for industrial and rental duty

Specification envelope

What is normally inside a 500 kVA set

Typical envelope for this power class. Every row is confirmed against the engine and alternator datasheets before order.
Item Typical range Why it matters
Engine Six-cylinder, 12.0-14.5 L, electronic governor Block load acceptance and fuel efficiency at part load
Alternator Brushless, class H insulation, IP23, AVR controlled, 2/3 pitch Voltage recovery with chillers, drives and UPS loads
Fuel consumption 72-81 L/h at 75% load (300 kW) Sizing of day tank and bulk storage
Base tank autonomy 700-900 L, 9-11 h at 75% load Whether a separate bulk tank is required
Noise at 7 m 69-76 dB(A) canopy, 80-87 dB(A) open frame Boundary and night-time limits
Weight 4.0-5.0 t open, 4.3-5.4 t canopy Foundation, route and lifting capacity
Footprint Approximately 4.4-5.2 m x 1.6 m canopy Plant room layout and radiator airflow

Sizing

Five numbers that decide a 500 kVA specification

  • Running kW at the bus. 400 kW at 0.8 power factor. Add the essential loads and keep non-essential cooling or process loads on a shed group.
  • Largest load step. Chillers, lifts and large pumps are the critical items. Staging the sequence is often what allows 500 kVA instead of 630 kVA.
  • Duty rating. Continuous prime power duty on a rental or industrial site is rated lower than standby duty for the same hardware, and the fuel curve changes with it.
  • Site conditions. Above roughly 40 C ambient or 1000 m altitude the derating curves apply. Gulf summer conditions sit at or beyond that boundary.
  • Autonomy. 72-81 L/h at 75% load means a day tank of 800 L covers about 10 hours. Longer autonomy moves the project to a bulk tank and a fuel transfer system.

Applications

Typical 500 kVA applications

  • Hospitals

    A complete essential bus covering theatres, imaging, medical gas, lifts and refrigeration, often as one of a pair.

  • Data halls and IT rooms

    Technical load with UPS support, where the set is run regularly on load and the fuel and cooling systems are designed for it.

  • Hotels and mixed-use towers

    Lifts, pumps, kitchen, lighting and part of the air conditioning, with the transfer time written into the electrical design.

  • Industrial and rental duty

    Ready-mix plants, batching, crushing and temporary utility power, where the set runs as prime power for long periods.

Options

Options usually specified at 500 kVA

Option What it changes
Paralleling control Two 500 kVA sets sharing load, or one running while the other is serviced, without an outage on the critical bus
Container or canopy Walk-in container for weather protection and security, or a canopy where the yard is already prepared
Motorised ATS Changeover at 800-1000 A, interlocked, with adjustable transfer and return delays
Alternator choice 2/3 pitch and a full neutral where drives, LED lighting and UPS systems dominate the load
Fuel system Bunded base tank, day tank or bulk tank with a transfer pump and level alarms

Questions

500 kVA questions we are asked

How many kW is a 500 kVA generator?

400 kW at 0.8 power factor. At the emergency standby rating of 550 kVA the same machine is quoted as 440 kW. The 100 kW difference between the two figures is entirely a question of which duty the unit is sold for.

How much fuel does a 500 kVA generator burn per hour?

Budget 72-81 L/h at 75% load, which is 300 kW running load, and about 96-108 L/h at full load. A 10 hour outage at 75% load therefore consumes roughly 750 L, so fuel delivery arrangements matter as much as the tank itself.

Can two 500 kVA sets run in parallel?

Yes, when both are ordered with paralleling-capable controllers, matching alternators and a synchronising panel. Load sharing, reverse power and overcurrent protection are all part of that package. Sets supplied without those controls cannot simply be connected together later.

What transformer or switchgear rating goes with 500 kVA?

At 400 V the full-load current is 722 A, and about 794 A at the standby rating. Switchgear and busbars are normally selected for the higher figure, and where the set feeds a transformer the transformer is sized for the set output rather than the load alone.

Canopy or container for a 500 kVA set?

A canopy is enough where the machine stands in a prepared yard with drainage and access. A container is the better answer where it stands outdoors for years, where security matters, or where the site needs the tank, cabling and controls inside one enclosure.

Need a 500 kVA quotation?

Send the essential load list, the largest load step and the fuel autonomy you need. You will get a rating, a fuel figure and the build options that fit your site.

Request a quote

Scroll to Top
WhatsApp