{"id":3251,"date":"2026-11-18T08:36:20","date_gmt":"2026-11-18T04:36:20","guid":{"rendered":"https:\/\/kvagrid.com\/blog\/diesel-generator-for-telecom-site\/"},"modified":"2026-11-18T08:36:54","modified_gmt":"2026-11-18T04:36:54","slug":"diesel-generator-for-telecom-site","status":"publish","type":"post","link":"https:\/\/kvagrid.com\/ar\/blog\/diesel-generator-for-telecom-site\/","title":{"rendered":"Diesel Generators for Telecom Sites: Sizing, Duty Cycle and Fuel Logistics"},"content":{"rendered":"<p><!-- KVAGRID blog article \/blog\/diesel-generator-for-telecom-site\/ - part of the generator selection and engineering practice series; H1 is output by the theme from the article title --><br \/>\n<!-- Topic basis: gap in the selection series (no existing page on telecom or base-station duty; nearest are prime-vs-standby-power, how-long-can-a-diesel-generator-run, generator-ups-interaction, diesel-generator-fuel-consumption). Writing date 2026-11-18.\n Numeric basis (reused, not re-derived): \/blog\/diesel-generator-fuel-consumption\/ (0.24-0.29 L\/kWh; 500 kVA at 101 L\/h full load, 80 L\/h at 75 % and 60 L\/h at 50 %; 1000 kVA about 200 L\/h and about 4800 L over 24 hours), \/blog\/diesel-generator-maintenance-schedule\/ (annual load test at 50 %-100 % of rating; 10 %-20 % light-load band; oil and filter 250-500 h), \/blog\/prime-vs-standby-power\/ (ISO 8528-1 ratings and the 10 % overload allowance on prime power), \/blog\/generator-ups-interaction\/ (rectifier and UPS load behaviour), \/blog\/hot-humid-climate\/ and radiator siting pages (40 degC reference ambient).\n Site loads, hours per year, derating factors and fuel autonomy are set by the operator's load records and the equipment manufacturer's data. This page contains no commercial terms, location details, approval identifiers or legal citations. --><\/p>\n<p class=\"kv-lede\">A telecom site is a base load, not an outage. The generator is the only supply for most of the day, so the machine has to be rated for continuous duty, loaded evenly for hours at a time, and kept inside a load band where the engine can stay hot. Getting the rating and the fuel autonomy right at the start is cheaper than correcting either afterwards.<\/p>\n<h2>What the site actually draws<\/h2>\n<p>Telecom loads are mostly direct current, and they arrive at the generator through rectifiers rather than directly. The set therefore sees the rectifier as its load, not the radio equipment, and the rectifier carries the site&#8217;s peak, its harmonic content and its start-up behaviour. Before any kVA figure is discussed, the load list should be built from records, not from a nameplate count.<\/p>\n<div class=\"kv-table\">\n<table>\n<thead>\n<tr>\n<th>\u0627\u0644\u062d\u0645\u0644<\/th>\n<th>Behaviour over 24 hours<\/th>\n<th>What to record for sizing<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Radio and transmission equipment, through rectifiers<\/td>\n<td>Almost constant; the true base load of the site<\/td>\n<td>Average DC current, rectifier output rating, rectifier efficiency, measured AC input kW<\/td>\n<\/tr>\n<tr>\n<td>Rectifier redundancy<\/td>\n<td>Online spare modules carry a share of the load<\/td>\n<td>Whether spare capacity is loaded or idle, and how the set sees it on the AC side<\/td>\n<\/tr>\n<tr>\n<td>Air conditioning<\/td>\n<td>Cycles with outdoor temperature and solar gain<\/td>\n<td>Running kW and starting method of each unit<\/td>\n<\/tr>\n<tr>\n<td>Lighting, security and access control<\/td>\n<td>Small and steady, with some night load<\/td>\n<td>Connected kW<\/td>\n<\/tr>\n<tr>\n<td>Battery recharge<\/td>\n<td>High for a period after any discharge<\/td>\n<td>Recharge current limit and the hour or two it lasts<\/td>\n<\/tr>\n<tr>\n<td>Future expansion<\/td>\n<td>Added later without a new machine<\/td>\n<td>The expansion the operator already plans for the site<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>The largest single number on that list is usually the air conditioning, not the radio equipment, and it is the number most often left out of a load list drawn from nameplates. The generator has to carry the site as it runs, which includes the hot afternoon, the recharge after a battery event and the spare rectifier module that nobody counts because it is &#8220;backup&#8221;.<\/p>\n<h2>Why the rating decides the life of the machine<\/h2>\n<p>On a telecom site the generator is normally the prime supply. That rules out an emergency standby rating as the normal choice, and it makes the duty statement the first item in the specification. The definitions come from ISO&nbsp;8528-1 and are reproduced across this series.<\/p>\n<div class=\"kv-table\">\n<table>\n<thead>\n<tr>\n<th>\u0627\u0644\u0642\u062f\u0631\u0629<\/th>\n<th>Fit for a telecom site<\/th>\n<th>\u0642\u0627\u0639\u062f\u0629 \u0627\u0644\u062d\u0645\u0644<\/th>\n<th>Consequence if used anyway<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>ESP \u2014 \u0627\u062d\u062a\u064a\u0627\u0637\u064a \u0644\u0644\u0637\u0648\u0627\u0631\u0626<\/td>\n<td>Only where a reliable grid exists and outages are short<\/td>\n<td>\u062d\u0645\u0644 \u0645\u062a\u063a\u064a\u0631 \u062f\u0648\u0646 \u0632\u064a\u0627\u062f\u0629 \u0645\u0633\u062a\u0645\u0631\u0629<\/td>\n<td>Continuous operation at site load shortens engine life and voids the basis of the rating<\/td>\n<\/tr>\n<tr>\n<td>PRP \u2014 \u0627\u0644\u0642\u062f\u0631\u0629 \u0627\u0644\u0623\u0648\u0644\u064a\u0629<\/td>\n<td>The normal choice where the site has no dependable grid<\/td>\n<td>\u062d\u0645\u0644 \u0645\u062a\u063a\u064a\u0631\u060c \u0648\u0632\u064a\u0627\u062f\u0629 10 % \u0644\u0645\u062f\u0629 \u0633\u0627\u0639\u0629 \u0648\u0627\u062d\u062f\u0629 \u0641\u064a \u0643\u0644 12 \u0633\u0627\u0639\u0629<\/td>\n<td>Works as designed; service intervals follow the hour meter<\/td>\n<\/tr>\n<tr>\n<td>COP \u2014 \u0627\u0644\u0642\u062f\u0631\u0629 \u0627\u0644\u0645\u0633\u062a\u0645\u0631\u0629<\/td>\n<td>Where the site load is genuinely steady<\/td>\n<td>\u062d\u0645\u0644 \u062b\u0627\u0628\u062a \u062f\u0648\u0646 \u0633\u0645\u0627\u062d \u0628\u0632\u064a\u0627\u062f\u0629<\/td>\n<td>Carries a steady base load but leaves little room if the load grows<\/td>\n<\/tr>\n<tr>\n<td>DCP \u2014 \u0642\u062f\u0631\u0629 \u0645\u0631\u0643\u0632 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a<\/td>\n<td>Sites that are specified like a small data centre<\/td>\n<td>Variable load with a defined average load factor<\/td>\n<td>Appropriate where the operator specifies it; not a default for a tower site<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>Prime also fixes the service logic: oil and filter intervals counted in running hours rather than the calendar, and a load test once a year between half and full rating. A set running most of every day reaches its first oil interval in weeks, not months. That is a planning fact about the site, and it belongs in the operating budget from the first month.<\/p>\n<h2>Sizing steps, in the order that matters<\/h2>\n<p>Sizing a telecom set is a sequence of corrections, not one calculation. Each step reduces the kVA the site can actually use, and skipping any of them produces a set that is either short of load or too large for the load it carries.<\/p>\n<div class=\"kv-table\">\n<table>\n<thead>\n<tr>\n<th>\u0627\u0644\u062e\u0637\u0648\u0629<\/th>\n<th>What is settled<\/th>\n<th>Source of the figure<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>1. Base load in kW<\/td>\n<td>Measured rectifier and AC input power, with the site at its real load<\/td>\n<td>Site load records and a power measurement, not nameplate addition<\/td>\n<\/tr>\n<tr>\n<td>2. Load shape<\/td>\n<td>Peak hour, night load and the recharge window after a battery event<\/td>\n<td>Logged data or the operator&#8217;s load profile<\/td>\n<\/tr>\n<tr>\n<td>3. Non-linear load<\/td>\n<td>How the rectifiers and UPS present current to the alternator<\/td>\n<td>Rectifier data sheet and the site&#8217;s measured waveform<\/td>\n<\/tr>\n<tr>\n<td>4. Ambient and altitude<\/td>\n<td>The site&#8217;s design temperature and elevation, against the 40&nbsp;&deg;C reference used in this series<\/td>\n<td>Site climate record and the manufacturer&#8217;s derating tables<\/td>\n<\/tr>\n<tr>\n<td>5. Enclosure and siting<\/td>\n<td>Silent canopy, container or room, and the air path it allows<\/td>\n<td>Manufacturer&#8217;s installation data and the site layout<\/td>\n<\/tr>\n<tr>\n<td>6. Starting duty<\/td>\n<td>Air-conditioner compressors or pumps starting on the set<\/td>\n<td>Motor starting method and the voltage-dip allowance the site tolerates<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>Steps 3 to 6 are the ones that are usually assumed instead of checked. A rectifier bank with a high crest factor loads an alternator differently from a resistive load of the same kW, and the alternator has to be chosen for the current it will actually deliver. The ambient correction matters more in a hot, dusty climate than in a temperate one, and a canopy that restricts air flow carries less than the same set in an open frame.<\/p>\n<p>Where the load is small but must run for years, two smaller sets in parallel often beat one large set: the duty stays inside a healthy load band, and one machine can be serviced while the other carries the site. Paralleling has its own control requirements, so it is a design decision rather than a default.<\/p>\n<h2>Fuel autonomy is the real constraint<\/h2>\n<p>On a site with no reliable grid, fuel is the operating cost that dominates everything else, and autonomy decides how often somebody has to visit. Consumption follows load, and the planning figures used across this series are 0.24 to 0.29&nbsp;L per kWh.<\/p>\n<div class=\"kv-table\">\n<table>\n<thead>\n<tr>\n<th>\u0627\u0644\u0645\u062c\u0645\u0648\u0639\u0629<\/th>\n<th>\u062d\u0645\u0644 100 %<\/th>\n<th>\u062d\u0645\u0644 75 %<\/th>\n<th>\u062d\u0645\u0644 50 %<\/th>\n<th>Over 24&nbsp;h at full load<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>500 kVA<\/td>\n<td>101 L\/h<\/td>\n<td>80 L\/h<\/td>\n<td>60 L\/h<\/td>\n<td>\u062d\u0648\u0627\u0644\u064a 2,420 \u0644\u062a\u0631<\/td>\n<\/tr>\n<tr>\n<td>1000 kVA<\/td>\n<td>\u062d\u0648\u0627\u0644\u064a 200 \u0644\u062a\u0631\/\u0633\u0627\u0639\u0629<\/td>\n<td>\u062d\u0648\u0627\u0644\u064a 160 \u0644\u062a\u0631\/\u0633\u0627\u0639\u0629<\/td>\n<td>\u062d\u0648\u0627\u0644\u064a 120 \u0644\u062a\u0631\/\u0633\u0627\u0639\u0629<\/td>\n<td>\u062d\u0648\u0627\u0644\u064a 4,800 \u0644\u062a\u0631<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>Two conclusions follow. First, a telecom site that runs all day needs either a bulk tank, a refuelling arrangement on a fixed cycle, or a smaller machine, because a day tank sized for a short outage gives hours of autonomy and nothing more. Second, consumption per day, not consumption per hour, is the number the operator plans against: at 50&nbsp;% load a 500&nbsp;kVA set takes about 1,440&nbsp;L over a full day, and that figure multiplied by the refuelling interval is the size of the tank.<\/p>\n<p>Theft and contamination belong in the same calculation. A remote tank needs level monitoring, a lockable fill point and a fuel polishing routine, and contaminated fuel stops a set at the worst possible moment. Vent sizing, overfill protection and bunding are engineering requirements, not accessories.<\/p>\n<h2>Cutting running hours<\/h2>\n<p>The cheapest hour of fuel is the one the generator does not run, so most operators reduce running hours before they buy a smaller set. The methods below are the common ones, and each changes what the generator is asked to do.<\/p>\n<div class=\"kv-table\">\n<table>\n<thead>\n<tr>\n<th>\u0627\u0644\u0637\u0631\u064a\u0642\u0629<\/th>\n<th>\u0645\u0627 \u0627\u0644\u0630\u064a \u064a\u063a\u064a\u0651\u0631\u0647<\/th>\n<th>What the generator still has to deliver<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Battery bank sized for night load<\/td>\n<td>Shifts running hours to a shorter block per day<\/td>\n<td>Higher load during the run, including recharge, but inside the rating<\/td>\n<\/tr>\n<tr>\n<td>Solar or hybrid supply<\/td>\n<td>Reduces daytime running hours further<\/td>\n<td>The same recharge duty and a stable AC supply for the rectifiers while running<\/td>\n<\/tr>\n<tr>\n<td>Load shedding of air conditioning<\/td>\n<td>Removes the largest cyclic load while the set runs<\/td>\n<td>Enough peak capacity for the loads that stay on<\/td>\n<\/tr>\n<tr>\n<td>Duty cycling of the site<\/td>\n<td>Shortens the daily run to a planned block<\/td>\n<td>Reliable starting and full load acceptance from cold<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>Reducing hours is only useful if the set still runs inside a healthy band while it does run. Below about 30&nbsp;% of rating the engine runs cool, combustion is incomplete and soot accumulates, and light-load running for hours is a failure mode of its own. A hybrid site that keeps the generator at a token load for a long period is not saving fuel; it is damaging the machine. Keep the running block in the 30&nbsp;% to 75&nbsp;% band where the load profile allows it, and use the annual load test at 50&nbsp;% to 100&nbsp;% to clear what light running leaves behind.<\/p>\n<h2>Service on a site nobody visits<\/h2>\n<p>A telecom site usually has no one on site. That changes the service model: intervals counted in running hours, a stock of filters, belts and coolant, and remote monitoring that reports what the local panel cannot. Oil analysis at the first interval is the cheapest early warning available for fuel dilution, coolant ingress and wear.<\/p>\n<p>The monitoring worth having is unglamorous: running hours, fuel level, coolant temperature, oil pressure, battery voltage, load current per phase and the status of the transfer arrangement. Those readings turn a site visit from a diagnosis into a service, and they show fuel theft within a day rather than at the next delivery.<\/p>\n<div class=\"kv-faq\">\n<details>\n<summary>Does a telecom site need a prime rated generator?<\/summary>\n<p>Where the generator is the normal supply rather than a short-term standby, yes. A prime power rating is defined for unlimited hours a year at variable load with a 10&nbsp;% overload allowance for 1&nbsp;h in 12&nbsp;h. An emergency standby rating is intended for mains failure and is not the right basis for a machine that runs most of every day.<\/p>\n<\/details>\n<details>\n<summary>Why is the air conditioning often bigger than the radio load?<\/summary>\n<p>Radio equipment draws a modest, steady current through the rectifiers, while the cooling has to remove the heat of the shelter, the equipment and the sun on the enclosure. In a hot climate the air conditioners can dominate the load list, and their compressors also set the starting duty the generator has to accept.<\/p>\n<\/details>\n<details>\n<summary>Can a telecom generator run 24 hours a day?<\/summary>\n<p>Yes, within a rating that allows it. A prime or continuous rated set carries the site load indefinitely, with service intervals counted in running hours and an annual load test between 50&nbsp;% and 100&nbsp;% of rating. Running it continuously at very light load is a separate problem and should be avoided.<\/p>\n<\/details>\n<details>\n<summary>How much fuel does a site use per day?<\/summary>\n<p>It follows the load, at 0.24 to 0.29&nbsp;L per kWh. A 500&nbsp;kVA set at 50&nbsp;% load takes about 60&nbsp;L\/h, so about 1,440&nbsp;L over a full day; the same set at full load takes about 101&nbsp;L\/h. The tank and the refuelling cycle are sized from that daily figure, not from the hourly one.<\/p>\n<\/details>\n<details>\n<summary>What happens if the generator runs at very low load all the time?<\/summary>\n<p>The engine runs cool, combustion is incomplete and soot and unburnt fuel accumulate in the exhaust and the cylinder. The visible result is smoke, oil dilution and falling performance. Keep running loads in the 30&nbsp;% to 75&nbsp;% band where the load profile allows, and use the annual load test to clear what light running leaves behind.<\/p>\n<\/details>\n<details>\n<summary>Do rectifiers and UPS equipment change the sizing?<\/summary>\n<p>They change how the load presents itself to the alternator. Non-linear loads draw current in short pulses with a high crest factor, so the alternator has to be chosen for the current it will actually deliver rather than for the kW alone. The rectifier data sheet and the site&#8217;s measured waveform are the inputs, and the alternator selection follows from them.<\/p>\n<\/details>\n<\/div>\n<div class=\"kv-cta\">\n<h2>State the duty before the set is chosen<\/h2>\n<p>Send the site&#8217;s measured load, the hours the set will run, the design ambient and altitude, the cooling arrangement and the fuel autonomy you need. The review will state which rating fits, the load band the site should run in, and the fuel and service arrangement that goes with it.<\/p>\n<p><a class=\"kv-btn kv-btn--primary\" href=\"\/ar\/request-a-quote\/\">\u0627\u0637\u0644\u0628 \u0639\u0631\u0636 \u0633\u0639\u0631<\/a> <a class=\"kv-btn kv-btn--tertiary\" href=\"https:\/\/wa.me\/8615937596863\" target=\"_blank\" rel=\"noopener nofollow\">\u0631\u0627\u0633\u0644 \u0642\u0633\u0645 \u0627\u0644\u0645\u0628\u064a\u0639\u0627\u062a \u0639\u0644\u0649 \u0648\u0627\u062a\u0633\u0627\u0628<\/a><\/p>\n<\/div>\n<p class=\"kv-note\">KVA Grid sales engineering desk. Reused site figures: 0.24 to 0.29&nbsp;L\/kWh, 500&nbsp;kVA at 101\/80\/60&nbsp;L\/h and 1000&nbsp;kVA at about 200&nbsp;L\/h from <a href=\"\/ar\/blog\/diesel-generator-fuel-consumption\/\">\u0627\u0633\u062a\u0647\u0644\u0627\u0643 \u0627\u0644\u0648\u0642\u0648\u062f<\/a>\u061b \u0648\u0627\u062e\u062a\u0628\u0627\u0631 \u0627\u0644\u062d\u0645\u0644 \u0627\u0644\u0633\u0646\u0648\u064a \u0639\u0646\u062f 50 % \u0625\u0644\u0649 100 % \u0645\u0646 \u0627\u0644\u062a\u0635\u0646\u064a\u0641 \u0648\u0646\u0637\u0627\u0642 \u0627\u0644\u062d\u0645\u0644 \u0627\u0644\u062e\u0641\u064a\u0641 10 % \u0625\u0644\u0649 20 % \u0645\u0646 <a href=\"\/ar\/blog\/diesel-generator-maintenance-schedule\/\">\u062c\u062f\u0648\u0644 \u0627\u0644\u0635\u064a\u0627\u0646\u0629<\/a>\u061b \u0648\u062a\u0635\u0646\u064a\u0641\u0627\u062a ISO 8528-1 \u0648\u0633\u0645\u0627\u062d \u0627\u0644\u0632\u064a\u0627\u062f\u0629 10 % \u0645\u0646 <a href=\"\/ar\/blog\/prime-vs-standby-power\/\">\u0627\u0644\u0642\u062f\u0631\u0629 \u0627\u0644\u0623\u0633\u0627\u0633\u064a\u0629 \u0645\u0642\u0627\u0628\u0644 \u0642\u062f\u0631\u0629 \u0627\u0644\u0637\u0648\u0627\u0631\u0626<\/a>; rectifier behaviour from <a href=\"\/ar\/blog\/generator-ups-interaction\/\">\u062a\u0641\u0627\u0639\u0644 \u0627\u0644\u0645\u0648\u0644\u0651\u062f \u0645\u0639 UPS<\/a>; the 40&nbsp;&deg;C reference ambient from <a href=\"\/ar\/blog\/diesel-generator-hot-humid-climate\/\">\u0627\u0644\u0645\u0646\u0627\u062e \u0627\u0644\u062d\u0627\u0631 \u0648\u0627\u0644\u0631\u0637\u0628<\/a>. Hours per year, derating factors, service intervals and load limits are set by the engine and alternator manufacturer and the operator&#8217;s specification. Reviewed 18 November 2026.<\/p>","protected":false},"excerpt":{"rendered":"<p>A telecom site is a base load, not an outage. The generator is the only supply for most of the [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[19],"tags":[],"class_list":["post-3251","post","type-post","status-publish","format-standard","hentry","category-selection-guides"],"_links":{"self":[{"href":"https:\/\/kvagrid.com\/ar\/wp-json\/wp\/v2\/posts\/3251","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kvagrid.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kvagrid.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/kvagrid.com\/ar\/wp-json\/wp\/v2\/comments?post=3251"}],"version-history":[{"count":1,"href":"https:\/\/kvagrid.com\/ar\/wp-json\/wp\/v2\/posts\/3251\/revisions"}],"predecessor-version":[{"id":3252,"href":"https:\/\/kvagrid.com\/ar\/wp-json\/wp\/v2\/posts\/3251\/revisions\/3252"}],"wp:attachment":[{"href":"https:\/\/kvagrid.com\/ar\/wp-json\/wp\/v2\/media?parent=3251"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kvagrid.com\/ar\/wp-json\/wp\/v2\/categories?post=3251"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kvagrid.com\/ar\/wp-json\/wp\/v2\/tags?post=3251"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}